                      Daily SITREP---7th       @ngr   Bde                        Page   1



                      241250C JAV 91
                      To@ VIT Corps U-3

                            aL    Siiuation@      Brigade units continue cons',.ruction,of Log
                      Base E Icho.                      of EPtq corapound w4@ll begin to@iely. Units
                      continue to train wi'.h combat units.

                            h., Ope2,a.tions/Tng. Construction:

                                  (11)  Log Base Echo:

                                        (a)    Access Ro8-d---CO%


                                        (b)    TP-1--SO@)


                                        (C)    CT V 40%


                                  (2)   EPW Cozqpo7irid!

                            e.    C@iT@oAt Sup@or.@@ Eq,,iipytient Readiness             PIQ%




                                     Theater                 Theater             in TAAs
                                       5,8 0                    '70                4,@743

                            g.    Unit, Locations:

                                  HHC  -1 EITO EDE         @S   439144
                                  HHC  176th   E NG-'      NS   560560
                                  HHC  9'0@6th Eh7G GP     IJO  559612

                            h.    Prlobleins Requiring Corps A5,8is@@ance:

                                  (1)   We axe receiving intelligence gurawariev in                     4 or 5
                      @eparate raessag6s vjhi-bh tak& up to 12 hours to arrive through the
                      COLMM center. laesaages are often out of sequence Vlhat can be done
                      to ensure tiraely arrival thr-o,,igli the Stand Alone Comiii Center rtetl

                                  (2)   The ISIE@, '(-'heiiiir--aLl Corkoai-@y needs priority to receive
                      Coriv@,lsant Antidote for- @NE-ive Agen@.(C.A.@@TA) pills front the 332 IMED
                      BDE@

                          (3) Brigade is still drastically short @TVCis and
                      navigation dcvicls@           Brigade lirit-- -ay,       only 50% effective because
                      they cannot sea or navigate at Yiight.

                                  14)   lvlap distribution @,yill be -@ iri@ajor, problem for, the
                      Copps if a forviard niap, d6-oc@. is riot established sooii.
                      Maiii@@enaiace tents are.oyily a short                    partial     solution to a
                                     capable of stbriiig up to 150 pallets Tivith soace for
                      by-eakdo@,ni.

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 41 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily sitrep 7th engineer bde:11089615143325
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY SITREP 7TH ENGINEER BDE
Document Seq # = 5
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 08-NOV-1996