                                                       HQS, 7TH ENGINEER BRIGADE
                                                       OPERATIONS DESERT SHIELD
                                                       17i230 Jan 91




            1. Daily Corps O@ITREP@

                a, Situation. Brigade continues to monitor current
            sit uation. Engineers continue their missions.

                b.   Operations/Tng:

                     (1)  Engineer team digging in Corps TAC     0%

                     (2)  Clamshell - 60%


                     (3)  Dust Palliative - 10%


                     (4)  AFN station    OY

                     (5)  Loading ramp    10%

                e.   Combat Siippopt Equipment Readiness    Be

                f.   Personnel.


                        4 Pera ill           % in            Pers
                        Theater             Theater       in TAA's
                          522P@               63            4892


                g.   Unit 7@C30ationsf

                     HFC 7TH ENGR EDE      PS439144
                     HHC 176TH ENC7R GP    PS42Bl25
                     HHC 926TH ENGR GP     NS599730


                h. Problem Requiring Corps Assistance.

                     (1) Need training munitions or release to use demo liton
            UB'@ ASAP. BDE units will be required to conduct dismounted mine
            field and obstacle bpealches using demolitions . Training will be
            critically important to success of operations and force
            protection.

                     (2) Request Copps direct MSC's to issue DCU's to
            supporting erig,'@neeps concurrently with organic unit issues.
            Engineers need to be similarly equipped as the units they
            support.

                     (3) VII Corps SITREP #30 is incorrectly stated BDE
            employment statistics. 7th BDE has approximately 70 % of
ent closed in port, not 100% as reported.

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 41 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily sitrep 7th engineer bde:11089615143325
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY SITREP 7TH ENGINEER BDE
Document Seq # = 5
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 08-NOV-1996