Document Page: First | Prev | Next | All | Image | This Release | Search

File: 120396_jun96_decls9_0036.txt
Page: 0036
Total Pages: 41

Subject: DAILY SITREP 7TH ENGINEER BDE                                   

Unit: VII CORPS   

Parent Organization: ARCENT      

Box ID: BX000213

Folder Title: SITUATION REPORTS  7TH ENG BDE  22 DEC 90- 10 APR 91                                            

Document Number:          5

Folder SEQ  #:          1









                                                     HQS, 7TH ENGINEER BRIGADE
                                                     DTG 041500C JAN 91



           1. Daily Corps SITREP.

               a. Situation. Construction migsiong continue for all
           engineer units. Construction projects may suffer as we try to
           keep most of our critical engineer equipment up for future OPS.

               b. Operations/Tng. Major construction projects:

                    (1)  Corps Obstac2le Range--15%
                         43rd ADA Bernis--100%
                         210th FA Berine--90%
                         Corps Tank Gunnery Raiige--SOX
                         3AD Airfield--95%
                         207th MI Berms--20%
                         Corps Main Bepiiis--95%
                         MLRS Poaitions--100%

                    (2) Clamshell training postponed until 7 Jan 91 at 0800.

               a. Combat Support Equipment Readiness 91%

               f. Personnel


                         Pers in         % in             Pers
                       Theater          Theater         in TAAs


                         4,055           52%              3,924

               g.   Unit Locations:

                    HHC, 7th Engr Bde PS445145
                    176th EN GP        PS425125


               h.   Problems Requiring Corps Assistance:

                    (1) 7th EN BDE has given 0-2 four BDE access Posters and
           none of  them have made it to the front gate where our personnel
           need to  enter Corps Main.

                    (2) Brigade needs training ammunition and demolitions
           now. It is critical that engineers receive training NLT 15 Jan
           91.

                    (3) Mail continues to be a problem- A visit to the mail
           diztro point at Log Base 'A' yesterday found it in utter
           disarray. Eagerly awaiting newspapers in the TAA.

           2. POC S-3, 7th Engr Bde 9-7598-718.









                                                      AA

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 41 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily sitrep 7th engineer bde:11089615143325
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY SITREP 7TH ENGINEER BDE
Document Seq # = 5
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 08-NOV-1996