                                                                DTG 031500@@ JAN 91



              1. Daily Corps SITREP.

                   a. SitLLa'@ic)n. Construction missions continue for all
              engineer battalions. 92d EN BN Will move to Log Base Echo
              beginning on 5,Jari 91 to begin construction on new Corps Log
              Base     249th EN BN is also prepared to ova to Log Base "E" i+
              ?@'d LN BN cannot get the      @iaul,a@-sp-t@ tomffiove in time.

                   I:). Opei-atic)ris/Tng.   cl.amsliell hangar training is happening
              4 Jari at ARAMCO Air--Field    icor @xll. battalions.


                        Mission Status.      Corps Main Hellpad--IOOX
                                             3AD Air-field--80%
                                             Car-ps Main Berfns--73%
                                             -rF B-43 Berms--50%
                                             IAD (-)ir-Field--100%
                                             (.',or-ps C)bstacle Range--10%
                                             2ACR Air+ield--95%



                   -F.  l@'ersc3rnol


                                  Pars in             % in             Pars
                                 Theater            Theater          in TAAs


                                  41033                51%               912

                   g.   Ur-jit Locations.

                        HHC, 7th EN BDE PS445145
                        176 EN BP            PS425125


                   h.   Problem Requiring Corps Assistance-

                        (1) 7th EN BDE needs locations -For TaplinL- Road
              overpasses so we can spot our contracted gravel and materials at
              those loc@itioris.


                        (2) 92d EN PN requires dedicated ha@tl -Rssets to move its
S and 8 S@4Ps).

                        (3)   Mail. continues to be -R major problem.          T@iL- postal
              units in Log Base "A" are overwhelmed.            7-Lh EN BDE is providing R
              daily 25 man detail to asiist them.           Virtually no letters are
              being r-eceived -Fr(:)m Germany.     The brigade has not seen a current
              rlc-.wspapEar- -for 3 week@,@ T@iese two issues are adversely affecting
              moral a.


              2. POC S--3, 7t@i Engr Boa 9--7598-718.
                                                                                    'RV ("Pr Tt

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 41 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily sitrep 7th engineer bde:11089615143325
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY SITREP 7TH ENGINEER BDE
Document Seq # = 5
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 08-NOV-1996