Document Page: First | Prev | Next | All | Image | This Release | Search
File: 121096_apr96_decls2_0001.txt
Subject: PROTECTIVE MASK READINESS
Unit: XVIII CORPS
Parent Organization: ARCENT
Box ID: BX000052
Folder Title: DUTY LOG G3 1-15 DEC 90 CONT
Document Number: 73
Folder Seq #: 75
UNCLASSIFIED
01 03 141355Z DEC 90 00
cDRxvirIAB,NCORPS //DCS//
COMUSARCENT //AFRD-CS//
HODA WASH DC //DAMO-SWC//
CDRAMC ALEX VA //AMCCN-DCB//
CDRAMCCOM ROCK ISLAND IL //AMSMC-ASN//
COMDTUSACMLS FT MCCLELLAN AL //ATZN-CM//
CDRPBA AR //SMCPB-CD//
u K m I n u I @
SUBJECT: PROTECTIVE MASK READINESS
A. (U) MTG BETWEEN COL BARBEAU, XVIII ABN CORPS, AND MR CHAPMAN,
DESERT SHIELD PROTECTIVE MASK REPAIR FACILITY, 14 DEC 90, SAB.
1 @@ REF A MTG SOUGHT TO ASCERTAIN OPERATIONAL STATUS OF THE
MASK REPAIR FACILITY, CARRIER REPAIR/WASHOUT RATES, AND FAULTS
IDENTIFIED DURING INITIAL M17-SERIES MASKING TESTING. DURING FIRST
THREE DAYS OF OPERATION, 160 M17-SERIES MASKS WERE TESTED.
FORTY-FOUR PERCENT FAILED STANDARD QUALITY ASSURANCE TESTS. EACH
FAILED MASK CONTAINED ONE OR MORE POTENTIALLY-LIFE-THREATENING LEAK
PATHS. mos;r CENTERED ON THE VOICEMITTER ASSEMBLY OR ONE OF ITS
OS/NBC COMEBACK COPY
RAYMOND A. NARBEAU, COL, CM a
co CE CER
ZCCIHN EO BG, USA, DEPUTY COMMANDING GENERAL
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 3 f:/Week-15/BX000052/DUTY LOG G3 1-15 DEC 90 CONT/protective mask readiness:12069615464044
Control Fields 17
File Room = apr96_declassified
File Cabinet = Week-15
Box ID = BX000052
Unit = XVIII CORPS
Parent Organization = ARCENT
Folder Title = DUTY LOG G3 1-15 DEC 90 CONT
Folder Seq # = 75
Subject = PROTECTIVE MASK READINESS
Document Seq # = 73
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 06-DEC-1996