Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11







                                      UNCLASSIFIED
                                                                      04/19/91
                                    JULLS LONG REPORT

            .1. (U) JULLS NUMBER: 32753-86387 (00255), submitted by RILEY
            AFZN-DL-S, MR. MOORE, 856-4100, (913)239-4100.

            2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 01/31/91.

            3. (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
            COMPONENT, PLANS, LOGISTICS, ORDNANCE, INTEROPERABILITY, PLANNING,
            UNFAVORABLE, CRT2, CAPABILITY.

            4. (U) TITLE: PLANS & POLICY: NO PLAN TO ISSUE AMMUNITION BASIC
            LOAD


            5. (U) OBSERVATION: Requirement to issue ammunition basic load
            to units was not a planned action.

            6. (U) DISCUSSION: Because the upload of ammunition was not
            preplanned, numerous difficulties were experienced when
            equipping deploying units.

              a. Availability of 105mm was unclear.

              b. Missile support was difficult to obtain.

              C. Some units issues had to be rescheduled for departure
            because of the late arrival of ammunition. Some units came to
            the ASP up to four times to obtain their complete issue.

              d. Numerous vehicle load plans had to be changed to
            accommodate the ammunition.
            7. (U) LESSON LEARNED: A basic plan is needed for operations
            such as "Desert Shield" to prevent problems issuing basic load
            ammunition.


            B. (U) RECOMMENDED ACTION: Staff the requirement to deploy with
            ammunition basic load. If valid, update plans and establish
            prepositioned requisitions. Action is installation and
            deploying units.

            9. (?) COMMENTS:



            --- (U) SUBJECT: PLANS AND POLICY


                (U) INTEROPERABILITY: PLANNINS


                (U) Lesson distributed by: LOCAL.








                             UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996