Document Page: First | Prev | Next | All | Image | This Release | Search

File: 123096_jul96_decls1_0479.txt
Page: 0479
Total Pages: 517

Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11







                                      UNCLASSIFIED
                                                                      04/19/91
                                    JULLS LONG REPORT

           1. (U) JULLS NUMBER: 40336-27900 (00334), submitted by RILEY
           AFZN-PA-CF, Craig Stremell 856-6451, (913)239-6451.

           2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 01/31/91.

           3. (U) KEYWORDS: PLANNING, ORDERS/GUIDANCE, RWO (REAL WORLD OPS),
           USA (US ARMY), ACTIVE COMPONENT, COMMAND RELATIONSHIPS,
           FINANCE/BUDGET, PLANS, FACILITIES, UNFAVORABLE, CAPABILITY,
           COORDINATION, TIMELINESS, CRIT3 (IMPORTANT PROBLEM).

           4. (U) TITLE: Plans and Policy: Operation Canteen, Removal of
           Waste Service


           5. (u) OBSERVATION: Removal of Refuge

           6. (Lt) DISCUSSION: Lack of early preparation on th behalf a-F
           DACG (rear) created some minor refuge buildup outside of Hanger
           #817. Although this situation was rectified by DPCA personnel,
           it did create a sanitary hazard which attracted additional
           rodents into Hanger #817.

           7. (u) LESSON LEARNED: DPCA SOP should provide for "canteen"
           waste services during DACG Operation.

           B. (u) RECOMMENDED ACTION: Prior to coordination by the
           Departure Airfield Control Group (rear) with the refuge
           contractual services group could/would prevent refuge cluttering
           up and blowing around Marshal Army Airfield, in addition to the
           rodent invasion upon Hanger #817.

           9. (u) COMMENTS:    none



           --- (U) SUBJECT: PLANS AND POLICY


               (U) INTEROPERABILITY: PLANNING


               (U) Action managed by: LOCAL, action worked by:   RAP number:
                Lesson distributed by: LOCAL.

















                                      UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996