Document Page: First | Prev | Next | All | Image | This Release | Search

File: 123096_mar96_decls15_0008.txt
Page: 0008
Total Pages: 9

Subject: CLEARING PROCEDURES FOR UNITS REDEPLOYING FROM KKMC             

Unit: XVIII CORPS 

Parent Organization: ARCENT      

Box  ID: BX000019

Folder Title: DUTY LOG G3 REAR  22 MAR 91                                                                     

Document Number:         57

Folder Seq  #:         97









                  ANNEX 3 - CENTRUM OFFICE CLEARING PROCEDURES

        The, following procedures, need to be performed in order to turn over
        office space in the Centrum area to DEH:

        1.   office cleared of all U.S. material, equipment, supplies and
        waste to include window barrier paper.

        2.   Saudi office furniture left in place with a label indicating
        its origin.

        3.   U.S. office furniture and equipment turned into unit supply or
        MMC for final disposition.

        4.   office swept and damp mopped.

        5.   A list prepared of any damage repair necessary.

        6.   A joint inspection of the office areas conducted with a DEH
        representative.

        7.   Keys turned over to DEH office prior to departure.

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 9 f:/Week-09/BX000019/DUTY LOG G3 REAR 22 MAR 91/clearing procedures for units redeploying from k:12179611154856
Control Fields 17
File Room = mar96_declassified
File Cabinet = Week-09
Box ID = BX000019
Unit = XVIII CORPS
Parent Organization = ARCENT
Folder Title = DUTY LOG G3 REAR 22 MAR 91
Folder Seq # = 97
Subject = CLEARING PROCEDURES FOR UNITS REDEPLOYING FROM K
Document Seq # = 57
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996