Document Page: First | Prev | Next | All | Image | This Release | Search

File: 970107_jul96_decls5_0001.txt
Page: 0001
Total Pages: 1

Subject: DESERT SHIELD STORM AFTER ACTION REPORT PHASE 1                 

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001045

Folder Title: AFTER ACTION REPORTS PHASE I MOBILIZATION AND DEPLOYMENT                                        

Document Number:       2003

Folder Seq  #:         16











                                  OPERATION DESERT SHIELD/STORM
                                          NBC EQUIPMENT



          FLOW OF IST ID (M) REPLACEMENTS FOR NBC EQUIPMENT (DEC 90):
          FITTING               DRAW AT                     MASK CONFIDENCE
          NBC SCHOOL     --- >  CIF                  >      EXERCISE (3 HRS)
          (BLDG 211)            (BLDGS 376/360)             (CS CHAMBER)
          MASK                  MASK                        INSTALL FILTERS
          SUIT                  FILTERS (2 SETS)            INSPECT MASK
          BOOTS                 CARRIER                     COMPONENTS
          GLOVES                CANTEEN CAP*                TRANSPORT TO
                                INLET CAPS (2)              CHAMBER
                                EYELENS' OUTSERTS (2)
                                HEADHARNESS                 EXERCISE
                                VALVE DISKS (4)
                                HOOD*

            ITEMS DID NOT COME  IN A DEPOT PACK MASK; CIF   HAD TO STOCK.

          REMARKS: CIF HAD TO   BE FLEXIBLE WITH ISSUE OF   MASKS. INDIVIDUALS
          WERE ALLOWED TO SIGN  FOR MASK ON A DA 3161 AND   TO DX UNSERVICEABLES.
          POST CHEMICAL INSPECTED UNSERVICEABLES BEFORE TURN-IN.


          RESPONSIBILITIES BY ACTIVITY:

          POST CHEMICAL (NBC SCHOOL) -
            o  OBTAIN TWO SIZING SETS OF M17 SERIES MASKS (XS, S, M, L).
            o  OBTAIN ONE SIZING SET OF M25 SERIES MASKS (S, M, L)
            0  OBTAIN TWO BDO SIZING SETS TO INCLUDE GLOVES (XS, S; M, L).
            o  SIZE REQUIREMENTS ON A GROUP BASIS EACH WORK DAY AS REQUIRED.

          DOL  (CIF) -

            o  TRANSFER ROTC MASK STOCKS FROM RCB TO CIF.
            o  ISSUE/REQUISITION MASK ACCESSORIES AS ABOVE.

          IST  REPLACEMENT COMPANY -

            o  SCHEDULE FITTING WITH POST CHEMICAL.
            o  SCHEDULE DRAW WITH CIF.
            o  SCHEDULE CS CHAMBER EXERCISE WITH POST CHEMICAL AND BUS
 WITH TMP.











                                            111-32

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 1 f:/Week-27/BX001045/AFTER ACTION REPORTS PHASE I MOBILIZATION AND DEPLOYMENT/desert shield storm after action report phase 1:01029718422326
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-27
Box ID = BX001045
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = AFTER ACTION REPORTS PHASE I MOBILIZATION AND DEPLOYMENT
Folder Seq # = 16
Subject = DESERT SHIELD STORM AFTER ACTION REPORT PHASE 1
Document Seq # = 2003
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 02-JAN-1997