                                         24 FEB 91/G-DAY

            I. OPERATIONAL SLI44ARY

                A. FRAGOS ISSUED: FRAM 050 DTG 24113OZ, SLJBJ: Go Early

                B. TASK ORGANIZATION: Change to XVIII A13N Corps, See Appendix 1 to
            Annex A


                C. UNIT ARRIVALS: None


            II. LOGISRICAL SL14MY: LOGSM INPLIR (Paragraphs 4 and 9)
            4(U)o aLAss IV:

                A. DUST PALLIATIVE: 40,000 GALIONS CRUDE OIL ARRIVED VII COPPS 23
            FEB. TIUCKS UNLOADED/DEPARrED 231800C FEB. NEXT SUPMU DEPARTS 24 FEB
            FOR XVIII CORPS. WILL PROVIDE DEPARTURE TDE/NLMER OF TMCKS TO MAJ
            SAW.LZLNIS, 2MH LMO. UNDERSTAND VII ODRPS NEEDS OIL MM. IF SLZTTCIERR
            NLZEM OF TFDXKS ARE AITAILABU AT PEIlUoUN FEMM WILL OONSIDER
            SPLXMNG SHIPMENT. NEGOTIATIONS CONTINUE WITH SMGMC. POC CPr
            CAHnL/CPr REICHERT 7804-448.

                B. RPV IANDING SIRIP: @,MM PROOF MEMBRANE REQUESTM BY VII CORPS
            Nar A=ABLE THRWGH HOST NATION SOURCES. MAJ BAICAZAR, VII CORPS, HAS
            REDEMM REQUIREKWT; WILL ACCEPR A FABRIC OR CANVAS/OUrION DLJCK. ARCETU
            R4M CM=4G VENDORS FOR SUITABLE MATERIAL, BUT PROCUREMENT TIME WILL
            PROBABLY BE A PROBLEM. WAIN, SUGGEST USE OF M19 MATTING. FASTENING
            SYSI'EK WILL BE FABRICATED IN THE FIELD. POC CPr LAWSON 7804-448.
            9(Ut*    ENGINEER DATA:
                A.  POF4T ODNSTRUCTION/REHAB: NO CHANGE.

                B.  AIRFIELD MAINTENANCE AND REPAIR: NO CHANGE.


                C.  MAIN SUPPLY ROUTE MAINRENANCE AND REPAIR: NO CHANGE.


                D.  PIPELINE ODNSIRUCITON: NO CHANGE.


                E.  NEW WATER SOURCES: NO CHANGE.


                P.  OlliER.


                    1) EPW COMPOUNDS: CONTACTED BY MAJ GIBBS AND CPr KMION, 14TH MP
            BDE. UNDMSMM 14TH MP EDE ARE SHORT HOST MMON SMWIC ITEMS, IE.,
            BUSSES, WARNING SIGNS, AS WELL AS CL IV MATERIALS. MAJ DUNCAN, CRQTCW PM
            OFFICE (7804-895/876) D*U;@M OF CL II/HOST NATICN cMRrAGES. HOST
            NATION WILL NOT PROajRE ADDITIONAL CL IV SHORTAGES TO PEPIACE MAT HAS
            BEEN LOST. CL IV SHORTAGES MUST BE REWISITIONM M@OLM 2D COSCOM.
            ADDITIONAL CONCEEMNA AND LU4BER IS AWIABLE AT LOG BASE BRAVO AND 321ST
            M4C. UNDERSTAND PROBLEM WME OVER-SIZED GENERATORS AND LIMrn4G. 14TH
            MP EDE %iO= PIWEST TECHNICAL ASSISTANCE FROM 7TH EN BDE. POC CPT
            REICHERT 7804-448.


        DECLASSIFIED ON: 11 FEB 97 PER SEC ARMY (DAMH) UNDER SEC 3.4 EO 12958


                                           C@MY PG 1


                                  UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997