Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Parent Organization = CENTCOM
Unit = ARCENT
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Document Number = 5
Box ID = BX000525
UNCLASSIFIED
24 FEB 91/G-DAY
I. OPERATIONAL SLI44ARY
A. FRAGOS ISSUED: FRAM 050 DTG 24113OZ, SLJBJ: Go Early
B. TASK ORGANIZATION: Change to XVIII A13N Corps, See Appendix 1 to
Annex A
C. UNIT ARRIVALS: None
II. LOGISRICAL SL14MY: LOGSM INPLIR (Paragraphs 4 and 9)
4(U)o aLAss IV:
A. DUST PALLIATIVE: 40,000 GALIONS CRUDE OIL ARRIVED VII COPPS 23
FEB. TIUCKS UNLOADED/DEPARrED 231800C FEB. NEXT SUPMU DEPARTS 24 FEB
FOR XVIII CORPS. WILL PROVIDE DEPARTURE TDE/NLMER OF TMCKS TO MAJ
SAW.LZLNIS, 2MH LMO. UNDERSTAND VII ODRPS NEEDS OIL MM. IF SLZTTCIERR
NLZEM OF TFDXKS ARE AITAILABU AT PEIlUoUN FEMM WILL OONSIDER
SPLXMNG SHIPMENT. NEGOTIATIONS CONTINUE WITH SMGMC. POC CPr
CAHnL/CPr REICHERT 7804-448.
B. RPV IANDING SIRIP: @,MM PROOF MEMBRANE REQUESTM BY VII CORPS
Nar A=ABLE THRWGH HOST NATION SOURCES. MAJ BAICAZAR, VII CORPS, HAS
REDEMM REQUIREKWT; WILL ACCEPR A FABRIC OR CANVAS/OUrION DLJCK. ARCETU
R4M CM=4G VENDORS FOR SUITABLE MATERIAL, BUT PROCUREMENT TIME WILL
PROBABLY BE A PROBLEM. WAIN, SUGGEST USE OF M19 MATTING. FASTENING
SYSI'EK WILL BE FABRICATED IN THE FIELD. POC CPr LAWSON 7804-448.
9(Ut* ENGINEER DATA:
A. POF4T ODNSTRUCTION/REHAB: NO CHANGE.
B. AIRFIELD MAINTENANCE AND REPAIR: NO CHANGE.
C. MAIN SUPPLY ROUTE MAINRENANCE AND REPAIR: NO CHANGE.
D. PIPELINE ODNSIRUCITON: NO CHANGE.
E. NEW WATER SOURCES: NO CHANGE.
P. OlliER.
1) EPW COMPOUNDS: CONTACTED BY MAJ GIBBS AND CPr KMION, 14TH MP
BDE. UNDMSMM 14TH MP EDE ARE SHORT HOST MMON SMWIC ITEMS, IE.,
BUSSES, WARNING SIGNS, AS WELL AS CL IV MATERIALS. MAJ DUNCAN, CRQTCW PM
OFFICE (7804-895/876) D*U;@M OF CL II/HOST NATICN cMRrAGES. HOST
NATION WILL NOT PROajRE ADDITIONAL CL IV SHORTAGES TO PEPIACE MAT HAS
BEEN LOST. CL IV SHORTAGES MUST BE REWISITIONM M@OLM 2D COSCOM.
ADDITIONAL CONCEEMNA AND LU4BER IS AWIABLE AT LOG BASE BRAVO AND 321ST
M4C. UNDERSTAND PROBLEM WME OVER-SIZED GENERATORS AND LIMrn4G. 14TH
MP EDE %iO= PIWEST TECHNICAL ASSISTANCE FROM 7TH EN BDE. POC CPT
REICHERT 7804-448.
DECLASSIFIED ON: 11 FEB 97 PER SEC ARMY (DAMH) UNDER SEC 3.4 EO 12958
C@MY PG 1
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997