Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525




                                         Uqpkkk@@@IED

              I. OPERATICNAL SLMRY

                  A. FRAGOS ISSUED: FRAGO 072 DTG 032302Z, SLW: Relief of Riyadh
              Defense Mission

                  B. TASK CER.ANIZATION: Change to VII Corps and XVIII ABN Corps Task
              OrgarliZatiOn, See APPendix 1 to Annex A

                  C. UM ArdZTVAIS: None

              II. U)GISTICAL SLHMY: LOGSIAT INPUR (Paragraphs 4 and 9)

              CCt4,]AMERIS IDGISTICAL ASSESMM: CRITICAL CCM3AT ENGINEER TASKS REMAIN      w
              IN BOTH OORPS SEMRS. MOBILITY TASKS INCUJDE CIEARING SUPPLY IWM AND         i
              MFDUM ME4EFnU)S AND HAZARDOUS AREAS. CU-NTERMBNXN AND SLRVMBILNY
              TASKS SUPPORT EACH CORPS DEFENSE IN SECTOR. SUSEAINMW TASKS INCLUDE
              SUPPLY FOUM NAE?RENANCE AND REPAIR TO SUPPORT = LOGIMCS FWW. THESE
              TASKS CONTINUE TC) MM4IZE CORPS ENGINEER ASSETS Mnr. TMM UNAINUIMU
              FOR IEAC TASKS/MISSIONS. EAC ENGINEER UNITS CONTINUE THEIR MSR MIRRENANCE
              AND REPAIR IN THE CO@M AND HAVE JUMPED DAMGE ASSESSMENT TEAMS DM
              KUVULTT CITY. THE CUFd@aff ENGINEER FORCE SRRUCIURE IS SUFFICIENT TC)
              ACCO14MSH = MYRIAD OF MISSIONS IN ME AOR.
              4ILM CIASS IV:
                  A. MINEFIELD/HAZAPDOUS AREA MAFDUM: PLASTIC MArdUNG TAPE IS
              AMIABIE AT 165TH S&S AT EKMC. AM&ED WIRE DELIVERY DELAYED UNTRIL 03 MAR
              DUE TO 03TMCrOR PMBLEM. POC LTC MURPHY 7804-449.

                  B.  OTHER COMMODITIES: NO CHANGE.
              94U#O) ENGINEER DATA:

                  A.  FORT CONSIM=ON/REHAB: No CHANGE.                                    w

                  B.  AIMELD MAINTENANCE AND REPAIR: No aiAME.

                  C.  THEATER MIN SUPPLY F@OM MAINTENANCE AND REPAIR: MSR MACDONAM
                        MSR PYIE IS AMBER. BOIH BEING REPABUD/MUNFA.INM BY THEIR
              IS AM3ER.
              RESPECTIVE JTC-E OR JFC-N ENGINEERS. POC LTC NIafOIS 7804-233.

                  D. PIPELLINE OONSIRUMCN: PHASE V cctu@im up To TR4poRARy END ponu
              AT 96 IKK NAM; 475TH QK PREPARING TEMPORARY FTT.T. S=ON. POC Cpr
              BLECKMAN 7804-449.


                  E. NEW MTER SOURCES: NO CHANGE.

                  F. OTHER.


                      1) EPW CCHPOLNM: NO CHANGE.

                      2) %MTER MATERIAL FOR DISPLACED CIVILIANS: iqo aiAME.





                                              G+7 PG 1
                                        UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997