UNCLASSIFIED
Phase: Withdrawal BOS: N/A
Unit: HWB, ---/3 ACR Date: 14 May 91
POC: CPT Cellini, Troop Commander, 3-1598
1. ISSUE: Engineers Demolition
2. DISCUSSION: Engineers were tasked to destroy all ammo caches and
equipment once cease fire occurred. The sfi'uation was still fragile
and a counterattack was possible. The exploa-Mns caused by engineer
demolitions were random and +rec3uent wi nouncement and caused
great discomfort and concern S. The explosions
became so routine yet unaknou orting and took it -For
granted that it was the enql.R e very susceptible to attack,
during this period.
3. RECOMMENDATIOI\I: Central@. 4 demolitions an a specific
radio net and assigned recorder.
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 1 f:/Week-62/BX001803/AARS - DS-DS -2/engineers demolition 14 may 91:05099711373849
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-62
Box ID = BX001803
Unit = 3D ACR
Parent Organization = XVIII CORPS
Folder Title = AARS - DS-DS -2
Folder Seq # = 3
Subject = ENGINEERS DEMOLITION 14 MAY 91
Doc Seq # = 67
Doc Date =
Scan Date = 10-MAR-1997
Queued for Declassification = 11-MAR-1997
SAGWI Request = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 09-MAY-1997