Subject = ANNEX G ENGINEER                                                

Parent Organization = XVIII CORPS 

Unit = 24TH ID     

Folder Title = 1ST BDE OPORD 91-1 WIT FRAGOS 1 AND 2                                                           

Document Number =          6

Box ID = BX001447




                           UNCLASSIFIED





         ANNEX G (ENGINEER) 10 IBI)E UPORD 91-1 DESERI SLAM (OF7ENSIVE
         OPERATIONS)



         TIME ZONE USED THROUGHOUT THE ORDER: Charlie



         1. SITuA,r!ON.


            A. Enemy -Forces. Annex B (Intelligence).

            B. Friendly forces. See basic order. rF 3 Eng (one mech
         engineer company and two wheel companies) supports 2BdL-. TF 299
         rnq (one mech company, three wheel companies) supports 197 Bde.
         A/3 Eng supports 2-4 Cav. :56th Png Grp is Division engineer C2
         element with -162d Eng Co (Cbt Spt Eqpt) and 264th Eng Co (MGB)
         attached. 265th Eng Gp is (3S to Division with 46th, 52d and 844th
         Engineer Battalions (L:bt)(Hvy) attached. 1-41 FA has FASCAM
         capability.

            C. AttachmentsJDetachments. See Appendix I (Engineer Task
         Organization).



         2. MISSION. See basic order.



         7@. EXECUTION.


            A. Concept of the Operation. TF 5 Eng conducts engineer
         operations by phase to provide combat engineer components to lbde
         combined arms operations. Three mechanized and wheeled companies
         will be employed With maneuver tazk forces. Sapper teams will
         operate from armored vehicles when possible. Engineer heavy
         equipment will trail maneuver units. Engineer companies under TF
         5 Eng (-) control will provide support to lbde and, in conjunction
         With 1/24 [IP, will react to Level II and III threats in the E)de
         rear area as a Tactical Combat Force (TCF).


            B. Priority of engineer effort and support. See Appendix 2
         (Priority a-F Engineer Ef-fc3rt and Support).

            C. Tasks to TF 5 Eng

                 (1) Phase 1.


                      (a) Construct and maintain Marshalling Area Victory.
     DECLASSIFIEE)O) Construct portable ramps.
  *ON: 19 JUN 97
     BY: SEC ARMY (DAMHI UNDER SEC 3.4 EO 12958