Document Page: First | Prev | Next | All | Image | This Release | Search
File: 970725_sep96_decls34_0003.txt
Subject = ANNEX G ENGINEER
Parent Organization = XVIII CORPS
Unit = 24TH ID
Folder Title = 1ST BDE OPORD 91-1 WIT FRAGOS 1 AND 2
Document Number = 6
Box ID = BX001447
UNCLASSIFIED
(a) Phase V be prepared to breach friendly
obstacles in EA
TF 4-64.
(a) Phase III and Phase IV - be prepared to conduct
breaching operations.
(b) Phase IV - recon and prepare counterattack
rolites. Be prepared to conduct caltntermobility operations in EA
22.
(c) Phase V - widen gaps in breached obstacles.
E. Coordinating instructions.
(1) FASCAM employment. Release of long duration
artillery and long and short duration GEMSS mines by the Corps
Commander only. Release of short duration artillery mines (4
hours) by order of Division Commander only.
(2) Each TF has 4 FASCAMs for planning purposes.
(-,) Bde planned FASCAM included on Fire Support overlay.
(4) Employ engineer demolitions to destroy all RGFC
equipment.
4. SERVICE SUPPORT. Annex d (Logistics).
5. COMMAND AND SIGNAL.
A. Command. TF 5 Eng TOC located initially with lbde TOC.
S3 located at Bde TAC.
B. Signal. See basic order.
LEMOYNE
COL
Official:
cpr
:5@R F-ORTER
S-@, TF 5 ENG
Appendixes:
1 Engineer Tas@, Organization
2 Priority of Engineer effort and support
------ -- wpqrplippmfm UNCLASSIFIED
... . . .... .......
Document Page: First | Prev | Next | All | Image | This Release | Search