Document Page: First | Prev | Next | All | Image | This Release | Search

File: 970725_sep96_decls34_0003.txt
Page: 0003
Total Pages: 6

Subject = ANNEX G ENGINEER                                                

Parent Organization = XVIII CORPS 

Unit = 24TH ID     

Folder Title = 1ST BDE OPORD 91-1 WIT FRAGOS 1 AND 2                                                           

Document Number =          6

Box ID = BX001447





                                 UNCLASSIFIED



                        (a) Phase V     be prepared to breach friendly
           obstacles in EA


                        TF 4-64.

                        (a) Phase III and Phase IV - be prepared to conduct
           breaching operations.

                        (b) Phase IV - recon and prepare counterattack
           rolites. Be prepared to conduct caltntermobility operations in EA
           22.


                        (c) Phase V - widen gaps in breached obstacles.

              E. Coordinating instructions.

                   (1) FASCAM employment. Release of long duration
           artillery and long and short duration GEMSS mines by the Corps
           Commander only. Release of short duration artillery mines (4
           hours) by order of Division Commander only.

                   (2) Each TF has 4 FASCAMs for planning purposes.

                   (-,) Bde planned FASCAM included on Fire Support overlay.

                   (4) Employ engineer demolitions to destroy all RGFC
           equipment.


           4. SERVICE SUPPORT. Annex d (Logistics).


           5. COMMAND AND SIGNAL.

              A. Command. TF 5 Eng TOC located initially with lbde TOC.
           S3 located at Bde TAC.


              B. Signal. See basic order.




                                          LEMOYNE
                                          COL
           Official:


                             cpr
      :5@R F-ORTER
           S-@, TF 5 ENG

           Appendixes:

           1  Engineer Tas@, Organization
           2  Priority of Engineer effort and support
                                  ------ --     wpqrplippmfm UNCLASSIFIED
                                     ... . . .... .......

Document Page: First | Prev | Next | All | Image | This Release | Search