Document Page: First | Prev | Next | All | Image | This Release | Search
File: 970815_sep96_decls59_0007.txt
Subject = TAB D UNITS ENCLOSURE 1 COMMANDERS REPORT
Parent Organization = ARCENT
Unit = VII CORPS
Folder Title = MAJOR SUBORDINATE COMMAND HISTORICAL REPORTS-7TH CORPS SUPPORT GROUP 1
Document Number = 1
Box ID = BX000311
BASE CAMP WITH WORK AREAS, TACTICAL OPERATIONS CENTERS, SLEEP
AREAS, AND MOTOR PARKS. DURING THIS TIME THE HEADQUARTERS
ESTABLISHED A CLOSE RELATIONSHIP WITH THE 1ST AD (FWD) ELEMENT
AND ATTENDED THEIR DAILY 1600 HOUR MEETING. THE NEXT TWO WEEKS
WERE CONSUMED WITH BUILDING A BASE CAMP INTEGRATING 22D
MAINTENANCE COMPANY INTO THE BASE, ESTABLISHING COKMON
OPERATIONAL STANDARDS AND DEVELOPING BASE CLUSTER DEFENSE
PLANS. THE COMMON OPERATIONAL STANDARDS DEALT WITH FIELD
SANITATION, SPEED LIMITS, WEAR OF UNIFORMS AND LBE, WEAPONS
CLEANING AND PERSONAL HYGIENE. OUR METL WAS REASSESSED, BASE
DEFENSE PLANS AND REACTION FORCE PROCEDURES WERE ESTABLISHED AND
PRACTICED. FROM 26 DEC 1990 TO 16 JAN 1991 AN INDEPTII TRAINING
PROGRAM WAS EXECUTED EMPHASIZING THE FIVE STANDARD COSCOM DRILLS
AND FOUR ADDITIONAL 7TIl GROUP DRILLS. ON 22 DEC THE 47TH EOD
ARRIVED AND WAS ASSIGNED TO LTF 213. ON 23 DEC THE ALERT STATUS
WAS RAISED TO THREATCON CHARLIE. BLACK OUT DRIVE AT NIGHT WAS
INSTITUTED. DUE TO TERRORIST FEARS, ALL TOWNS IN THE AREA, IE
HAFIR AL BATIN AND AL QUAYSUMAH, WERE PLACED OFF LIMITS. NIGHT
LAND NAVIGATION TRAINING BECAME A PRIORITY AND THE TWO VEHICLE
RULE WAS ESTABLISHED. ON 27 DEC WE ESTABLISHED LIAISON WITH S-
3 DISCOM IST AD. ON 28 DEC WE ESTABLISHED A BALLISTIC MISSILE
EARLY WARNING SYSTEM WITH IST AD AND 2D COSCOM. THE SORTS REPORT
WAS REQUIRED ON 31 DEC FOR THE FIRST TIME.
OPERATIONALLY THE IST AD AND 7TH GROUP WERE INVOLVED WITH A
COUNTERATTACK MISSION IN THE EVENT IRAQ ATTACKED DOWN THE WADI AL
BATIN. THE S-3 SECTION WAS ALSO INVOLVED IN SCHEDULING ENGINEER
WORK AND WEAPONS QUALIFICATION RANGES ON THE 1ST AD GUNNERY
RANGE. THE S-3 SECTION HOSTED A TRAINING BRIEFING FOR BG
MCFARLIN AS LTF 213, 71, 87 AND THE GROUP COMMANDER PRESENTED
TRAINING PLANS THROUGH THE ISTH OF JANUARY. ON 7 JANUARY. THE
S-3 ESTABLISHED FULL LIAISON WITH THE 0-3, 1ST AD. FROM 7
JANUARY TO 17 JANUARY THE S-3 OFFICERS ICW THE LOG OPS OFFICERS
WORKED ON 'THE VII CORPS BATTLE PLAN' WITH IST AD G-3/(3-4 PLANS
AND THE 2D COSCOM ACS-SPO PLANS. THE VII CORPS TACTICAL PLAN
REQUIRED ARTILLERY AND ATTACK HELICOPTER FEINTS AND A PASSAGE OF
LINES AND AN ENVELOPEMENT AGAINST THE RGFC. THE 7CSG SUPPORTED
THE MAIN ATTACK. ON OR ABOUT 8 JANUARY, THE CORPS DIRECTED
'STAND TO' STARTED WHERE UNITS WERE RELEASED BY G-3, VII CORPS
AFTER ALL OF THE VORPS HAD BEFORTED READY, AFTER MUCH CONYU81ON
AND CONFLICTING GUIDANCE IT WAS ACERTAINED THAT LOCAL MSCS SHOULD
CONTROL 'STAND-TO'. ON 11 JANUARY WE STARTED A PM STAND-TO THAT
LASTED FOR SEVERAL DAYS IN RESPONSE TO A POSSIBLE PRE-EMPTIVE
STRIKE BY IRAQ. THE ROES ALSO CHANGED, AUTHORIZING A MAGAZINE
IN WEAPONS WHILE ON GUARD DUTY.
PART 2 DESERT STORM 0200HRS 17JAN TO 10 MARCH 91
AT 0230, 17JAN 7CSO WAS NOTIFIED THAT THE WAR HAD STARTED WITH A
Document Page: First | Prev | Next | All | Image | This Release | Search