Document Page: First | Prev | Next | All | Image | This Release | Search
File: 971208_sep96_decls2_0045.txt
Subject = OPERATIONS DESERT SHIELD 82D ENGINEER BATTALION 28 AUG 91
Box ID = BX000301
Folder Title = 82D ENG BN AFTER ACTION REVIEW COMMENTS 5 APR 91
Unit = VII CORPS
Parent Org = ARCENT
Tab E: Engineer Projects List
1. PROJECT: Site preparation for fuel bladders at the Port of
Dammam, 5 Dec 90.
DESCRIPTION: Leveled 100 meters X 100 meter area for fuel
bladders.
EQUIPMENT: Dozer - 8 hours
MAN HOURS: 10
UNIT: C Company, 82nd Engineer Battalion.
2. PROJECT: Vehicle holding area at the Fort of Dammam, 5-7 Dec
90.
DESCRIPTION: Level site for vehicles.
EQUIPMENT: Dozer - 8 hours
MAN HOURS: ge
UNIT: C Company, 82nd Engineer Battalion.
3. PROJECT: PX facility at the Port of Dammam.
DESCRIPTION-. Constructed a wall partition approximately 100
foot X 8 foot high, counters, and check-out lanes.
EQUIPMENT: Carpenter tools
MAN HOURS: 150
UNIT: D Company, 82nd Engineer Battalion
4. PROJECT: Tent City Construction, 12 Dec 90.
DESCRIPTION: Erected 100 GP Medium tents in support of the lst
Infantry Division (Forward) at the Port of Dammam.
EQUIPMENT: Carpenter tools
MAN HOURS; 41
UNIT: A Company. 82nd Engineer Battalion
5. PROJECT: 82nd Engineer Battalion Base Camp, 15 - 25 Dec 90.
DESCRIPTION: Constructed Battalion Base Camp which consisted
of 6000 meters of berm, 3000 meters of road, 1000 neters of
individual fighting positions, 65 GP medium tents, and 5 company
shower points.
Document Page: First | Prev | Next | All | Image | This Release | Search