Document Page: First | Prev | Next | All | Image | This Release | Search
File: 971208_sep96_decls2_0046.txt
Subject = OPERATIONS DESERT SHIELD 82D ENGINEER BATTALION 28 AUG 91
Box ID = BX000301
Folder Title = 82D ENG BN AFTER ACTION REVIEW COMMENTS 5 APR 91
Unit = VII CORPS
Parent Org = ARCENT
EQUIPMENT: Dozer - 321 hours
Bucket Loader - 192 hours
Small Emplacement Excavator(SEE) - 250 hours
Grader - 62 hours
MAN HOURS: 771
UNIT: 82nd Engineer Battalion.
6. Project: A Company, 159th Aviation Regiment perimeter berm and
survivability positions, 25 - 29 Dec 90.
DESCRIPTION: Constructed 4000 meters of berm, 1000 meters of
survivability positions, and 4 shower points. 25 - 29 Dec 90.
EQUIPMENT: Dozer - 32 hours
SEE 24 hours
M916 8 hours
MAN HOURS: 150
UNIT: A Company, C Company. 82nd Engineer Battalion
7. Project: 82nd Engineer Battalion Ammunition Storage
Point(ASP). 27 - 29 Dec 90.
DESCRIPTION: Constructed 500 meters of berm for the ASP.
EQUIPMENT: Dozer - IS hours
SEE - 2 hours
MAN HOURS: 31
UNIT: D Company, 82nd Engineer Battalion
8. PROJECT: 4th Transportation Battalion survivability positions,
16 - 18 Dec, 28 - 29 Dec go.
DESCRIPTION: Constructed vehicle and individual survivability
positions. Approximately 1000 meters of trench and 400 meters of
berm.
EQUIPMENT: Dozer - 28 hours
MQ!6 - 15 hours
SEE - 50 hours
MAN HOURS: 72
UNIT: A Company, C Company, 82nd Engineer Battalion
Document Page: First | Prev | Next | All | Image | This Release | Search