Document Page: First | Prev | Next | All | Image | This Release | Search

File: 980409_sep96_decls26_0004.txt
Page: 0004
Total Pages: 5

Subject = ESTABLISHMENT OF 350TH EVAC HOSPITAL WATER DISTRIBUTION SYSTEM  

Box ID = BX003208

Folder Title = 350TH EVAC HOSP-ANNEX E DEPMEDS AAR                                                             

Unit = OTSG        

Parent Org = HSC         







                                           DEPARTMENT OF THE ARMY
                                         350TH EVACUATION HOSPITAL
                                       OPERATION DESERT SHIELD/STORH
                                             KKHC, SAUDI ARABIA
                                               APO, NY 09734

                  ESTABLISHMENT OF 350TH EVACUATION HOSPITAL POWER DISTRIBUTION SYSTEM

             1.    SEQUENCE OF  POWER DISTRIBUTION SYSTEM INSTALLATION


             PHASE I -          Planning Process for Power Distribution
                                Administration Sections Powered
                                Power ICU Ward - A
                                OR I
                                CHS 1



             PHASE II -         Power X-Ray I
                                       EMT
                                             CHS (2 + 3)
                                             OR (2 + 3)

                                Environmental Control Units (ECU's) in all tempers and ISO's



             PHASE III          Power ICU B,C,D
                                       ICW 1-4
                                       Minimal Care Wards



             PHASE IV           Pharmacy
                                Lab
                                X-Ray 12
                                Blood Bank



             PHASE V            Forward Triage Area
                                Helipad (Landing Lights)



             2.    ANALYSIS



             PHASE I -

             1.    PROBLEM:     Power distribution system had to work around hospital layout
                                resulting in less than efficient use of power.
                   SOLUTION:    Power distribution team must be present for input into
                                hospital layout for efficient use of system.    (See Annex 2).
             2.    PROBLEM:     Power pull too great in CMS and OR area - (3) 100 AMP cables
                                to OR (50'), (8) 60 AMP cables to CHS (100').

                   SOLUTXON:    Separate CMS/OR units on opposite sides - Power cables used
                                specifically - (1) 100 AMP 50' - OR; (4) 60 AMP cables 100' to
                                CMS.

Document Page: First | Prev | Next | All | Image | This Release | Search