Document Page: First | Prev | Next | All | Image | This Release | Search

File: 980409_sep96_decls26_0005.txt
Page: 0005
Total Pages: 5

Subject = ESTABLISHMENT OF 350TH EVAC HOSPITAL WATER DISTRIBUTION SYSTEM  

Box ID = BX003208

Folder Title = 350TH EVAC HOSP-ANNEX E DEPMEDS AAR                                                             

Unit = OTSG        

Parent Org = HSC         







               (Cont., 2 ANALYSIS (POWER/PAGE 2)


               3.     PROBLEM:     Number of distribution boxes 400 AMP (7) insufficient to power
                                   hospital.

                      SOLUTION:    Identify   as   critical   shortage.      Increase    number    of
                                   distribution boxes 400 AMP to 13 (one per generator).



               PHASE  II -

               1.     PROBLEM:     All sterilizers were placed in I tent versus 2 resulting more
                                   power cables needed.

                      SOLUTION:    Leave sterilizers in   both work tents.



               PHASE  III -

               1.     PROBLEM:     Air conditioner unit near ICU (B) blocked by vestibules.
                      SOLUTION:    Shorten vestibule or lengthen vestibule connecting ICU A.
               2.     PROBLEM:     EQU not connected, to minimal due to lack of A Boxes and 400
                                   AMP distribution boxes.

                      SOLUTION:    Identify as critical shortage - Additional (10) A Boxes and
                                   (1) 400 AMP distribution boxes. Presently not part of DEPMEDS
                                   material sets.

               3.     PROBLEM:     minimal care units not environmentally comfortable due to not
                                   being additional.
                      SOLUTION:    Add ECU to DEPKED to include minimal care units.         (Liners,
                                   plenums).   Add tempers to DEPHEDS - Eliminate canvas which
                                   cannot support ECU'S.



               PHASE IV     NO PROBLEMS



               PHASE V

               1.     PROBLEM:     Exterior night lighting not available for triage.
                      SOLUTION:    Critical shortage Identified - Add exterior lighting units to
                                   DEPKEDS.








               PREPARED BY: ALBANESE/SADDLER

Document Page: First | Prev | Next | All | Image | This Release | Search