Document Page: First | Prev | Next | All | Image | This Release | Search
File: 950727_23400239_93a.txtIIR 2 340 0239 93/IRAQI WEAPONS PROGRAM PROJECT 75/1 (U). Filename:23400239.93a ENVELOPE CDSN = LGX621 MCN = 93034/00518 TOR = 930340015 RTTSZYUW RUEKJCS8103 0332335- --RUEALGX. ZNY HEADER R 022335Z FEB 93 FM JOINT STAFF WASHINGTON DC INFO RUEALGX/SAFE R 021956Z FEB 93 FM [ (b)(1) sec 1.3(a)(4) ] TO AIG 12176 INFO RUWTADA/HQ AFTAC-IN PATRICK AFB FL//IN// BT CONTROLS SECTION 001 OF 002 SERIAL: (U) IIR 2 340 0239 93. /*********** THIS IS A COMBINED MESSAGE ************/ BODY COUNTRY: (U) IRAQ (IZ). SUBJ: IIR 2 340 0239 93/IRAQI WEAPONS PROGRAM PROJECT 75/1 (U). WARNING: (U) THIS IS AN INFORMATION REPORT, NOT FINALLY EVALUATED INTELLIGENCE. REPORT CLASSIFIED - --------------------- - DEPARTMENT OF DEFENSE - --------------------- DOI: (U) 910730. REQS: (U) D-T5A-1610-02-90. SOURCE: [ (b)(1) sec 1.3(a)(4) ][ (b)(7)(D) ] SUMMARY: PROJECT 75/1 WAS INTIMATELY RELATED TO IRAQI EFFORTS IN THE BIOLOGICAL WARFARE WEAPONS PRODUCTION PROGRAM. THE PROJECT WAS PRIMARILY INSTITUTED TO PROVIDE COLD STORAGE FACILITIES FOR VARIOUS PROJECTS BEING CONDUCTED AT THE SALMAN PAK FACILITY. TEXT: 1. DESIGNATION--PROJECT 75/1 WAS ALSO KNOWN AMONG TECO ENGINEERS AS THE IBN AL HITHAM STORAGE FACILITY. THE PROJECT WAS ORIGINALLY COMMISSIONED AT A COST OF 300 MILLION DOLLARS. 2. PROJECT MISSION--PROJECT 75/1 WAS DESIGNED TO PROVIDE THE BIOLOGIST AND CHEMIST EMPLOYED AT THE SALMAN PAK RESEARCH FACILITY WITH MASSIVE LONG-TERM COLD STORAGE FACILITIES. THE PROJECT ALSO SERVED AS A COLD STORAGE AND TEMPERATURE-CONTROLLED EXPERIMENT FACILITY FOR PROJECTS BEING CONDUCTED AT THE ANIMAL MEDICINE FACTORY IN BAGHDAD, IZ. 3. PERSONALITIES AND FOREIGN PERSONNEL--PROJECT 75/1 WAS INITIALLY DIRECTED BY BEHNAM ((NA'AMAN)). NA'AMAN WAS REPLACED BY A U/I DIRECTOR ON AN UNSPECIFIED DATE BEFORE 880101. NO FOREIGN PERSONNEL WERE PERMITTED ACCESS TO THE FACILITIES AT PROJECT 75/1 OR SALMAN PAK. 4. FOREIGN EQUIPMENT--ALL EQUIPMENT WAS ORIGINALLY SUPPLIED AND RESUPPLIED BY THE ITALIAN GOVERNMENT. EQUIPMENT CONSISTED PRIMARILY OF STAINLESS STEEL PANELING, THERMOSTATS, AND INSULATED WIRING. NFI. 5. OPERATIONAL STATUS--PROJECT 75/1 CONTINUED AFTER THE CESSATION OF GULF WAR HOSTILITIES. COMMENTS: (U) QUESTIONS OR COMMENTS IN RESPONSE TO THIS IIR SHOULD BE FORWARDED TO CDR 202ND MI BN FT MONMOUTH NJ//IAM-C-OSD//. POC IS [ (b)(6) ]DSN 992-6042/5680, COMMERCIAL (908) 532-6042/5680, E-MAIL ADDRESS IAM002@MONMOUTH-EMH3.ARMY.MIL. //IPSP: (U) PT1610//. //COMSOBJ: (U) 141//. ADMIN PROJ: (U) 290700. INSTR: (U) US NO. PREP: (U) 2-60027. ACQ: (U) FT MONMOUTH NJ (930118). DISSEM: (U) FIELD: NONE. WARNING: (U) REPORT CLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search