Document Page: First | Prev | Next | All | Image | This Release | Search
File: 950811_20tr14_1_j17.txt
Filename:20tr14_1.j17
*********************************************
This document is a captured Iraqi military record.
It is provided in its original form to include Iraqi
classification markings (i.e. Top Secret, Secret, etc.).
These classification markings are NOT U.S. Government markings.
*********************************************
Field Engineering Bregade
Battalion FL 6
No. :229 SSH
Date : 9/7/1990
To: (unclear word)
Subject:Explosives removal
During our daily check - up of the oil wells we discovered that the explosives of Oum Qadier -
one of Leuitenant Abdel Karim Qassim Darraj group - have been removed . As this well is
positioned at (unlear words) new explosive were layed in place.
Please consider.
P.S. Major
Sabah Shahab Ahmed
9/7/1990
In the Name of God , the Merciful
Secret and Confidential
Field Engineering Squad/ Third Bregade
No. S/SH 191
Date : 9/25/1990
To : S/H/M/ Battalion 29
Subject: Planning
Letter (secret and confidential) third brigade command (H) No. 1832 dated 9/8/1990 coming to us
in the H A FL3 command (secret and confidential) No. 247 dated 9/18/1990 . Enclosed please
find the planning showing the places to lay explosives.
Please consider
Attached : 1- The planning
Colonel
GHAIB EID
Field Engineering Squad Commander /Third Brigade
In the Name of God , the Merciful
Military Engineering Command
Third Brigade
Operations
No. : H103-328
Date: 11/28/90
To :Engineering Units S.H.M. 29 Battalion
Suject : Detailed Informations about Targets ready to destroy
With reference to the oral order of the Brigade's commander , we wish you would provide us with
detailed information about the ready targets for sabotage postponed as in the illustration and
example attached.
Your reply to reach us urgently by hand with a letter describing your needs from materials.
Please consider with itmost importance and be very accurate to present the issue to the leader,
and report to us .
Attached :
1-A form
Colonel
Sa'ad Hassan Ibrahim
C/O Military Engineering Commander / Third Brigade
Copy to :
Engineering Squad H.M. FL3 - Please provide us with the details of materials taken form stores.
The commander of the Third Brigade /Field Engineering Battalion.
Dear Sir,
Subject : Report on the Vital Targets for postponed Sabotage .
The vital Targets for postponed sabotage have been surveyedat the 18th oil Center together with
the attached wells, the following was found :
1- All targets are ready for sabotage usingthe electric Method only.
2- Targets are distant from each other.
3- We need the following materials as the assignment is very important as in order to prepare the
sabotage by a second way.
A. For every well we need:
1. 400 meters plast
2. (7) meters safety plast
3. Ordinary lighter Model (27) quantity (2) two.
4. (2) capsuls
5. TNT explosives ( 10pounds).
6- Sabotage wires of 1 KLM length.
7- Electric lighters type (33) Quantaty (1) .
8- We need (30) sand sacks for every well.
There for the total materials needed for 14 wells in 5 sabotage positions:
1- Plast 400x19 = 7600 meters
2- Safety plast = (7) M x133 M.
3- Ordinary Lighers 2x19 = 38 Ordinary lighter.
4- Capsuls 2x19 = 38 capsuls.
5- TNT Explosive 10x19 = 190 pounds.
6- Destructive wires 1x19 = 19 KLM
7- Electrice lighter (33)=1x19 = 19 lighter
8- Sand Sacks 30x19=570 Sand Sacks
Leuitenant
Ghazi A. Mayzer
Second Division Commander
KHFL3
Document Page: First | Prev | Next | All | Image | This Release | Search