Document Page: First | Prev | Next | All | Image | This Release | Search

File: 950811_22tr5456_149.txt
Page: 149
Total Pages: 1


Filename:22tr5456.149
*********************************************
This document is a captured Iraqi military record.
It is provided in its original form to include Iraqi
classification markings (i.e. Top Secret, Secret, etc.). 
These classification markings are NOT U.S. Government markings.
*********************************************
	In the Name of God the Compassionate the Merciful
	Top Secret
the Second Platoon infantry brigade/ 18

No. (illegible) 1105

Date: Gumadi al AWal /1411

   12 / Oct. / 1990

	to All Units
	Subject / The Chemical arrangements for the  new location
	Top secret message of second platoon command 10153 on 21 / 11/
	1990 conveyed  by  
(illegible ) command top secret message 916 on 24/ 11/ 1990 conveyed by top secret message of 
command of  platoon 14 / 14419 on 3/ 12 /1990 conveyed to us by top secret message 510 of 
infantry / 18   on 4 / 12 /1990
  
The following arrangements shall be made for the building of a chemical observatory  and the 
partial sterilization of the units

1- The Chemical observatory :- A Chemical observatory shall be built in every big or small unit 
which is included in the chemical plan  according to the following specifications It should be 
under ground  of 2 m in length and 2.5 m in width and 2m in height.


















- The cleaning point should be ascertained by planting iron poles 100 m long 50 m wide with 
calculation of wind that is usual in the specific place.





	(1 - 2)
	Top Secret
	



3- Building of a big  3 x 4 m  underground room for gas and sterilization, to be built of blocks . It 
should have an entrance and an exit.


	 
	
	
4- A shelter should be built near the chemical observatory and the partial sterilization unit.
5- Three sterilization lines for the oven are to be chosen as follows:-
a- A sterilization line near the rotating location of  the  oven.
b- A sterilization line near the back.
c- A sterilization line near the front brigades.
d- The sterilization passages shall be the tarmac roads . (5) water tanks are to be placed near the 
line they should be labeled ( not drinking water  and buried under the ground.
e- Building of a (illegible) observatory,  according to the specifications in the book, where the 
room is located at the main platoon, back and moving platoons.  it should be started when the ( 
illegible ) is opened.

Lieutenant 
Gamal Adil Hameed
for/ commander ofthe 2nd platoon infantry/ 18
December 1990
	2-2
	Top secret.
 



 

 



Document Page: First | Prev | Next | All | Image | This Release | Search