                                  LOGISTIC/SUPPLY

        The month of January 1991 continued with the deployment of lst SRIG
      Forward in support of Operation Desert Shield, as it transitioned into
      Operation Desert Storm. The Logistics staff in country increased with
      the addition of the 2nd SRIG augments: Captain 3502, MGYSGT 0491, SSGT
      2311, @GT and CPL 0411, LCPL 0431, and LCPL 0151.

        The Headquarters Company of Ist SRIG was also augmented with
      additional Motor Transport and Engineer personnel, including a Motor
      Transport Officer (ISTLT 3502), and equipment including a wrecker,
      refueler, dump trucks, 5 tons, HMMWVS, 6K forklift, tools, etc;@ These
      additions provide a greater capability to support the expanded SRI
      Group structure, and the multiple unit locations throughout the AOR.

        With the split up of the I MEF Command Element into Main and Rear
      elements, the Logistics Officer deployed forward with a "Log Call" of
      personnel and equipment to support the Commanding Officer of Ist SRIG.
      This forward based element was able to provide greater flexibility of
      support to SRIG units operating in the AOR and also provided a better
      coordination point of contact with forward-Combat Service Support
      (CSS) elements of the ist Force Service Support Group (FSSG).

        The Logistics staff maintained responsibility for Camp 5, Jubail
      Saudi Arabia. This camp is the primary housing for the lst SRIG, our
      2d SRIG augmentees, and the I MEF CE. Receiving reinforcements
      continued to be a priority during the month, with emphasis on arrival
      embark control and the billeting plan.

        The influx of personnel into Camp 5 served to stress the capacity of
      the facilities. Problems compounded quickly with the start of
      hostilities. The contracted vendors for facilities maintenance and
rash piled up
      and the maintenance backlogged, the first heavy rains came to further
      compound the problem and turn the camp into a muddy pool. Steps were
      taken to bring the contractors back to work and the area slowly
      returned to a satisfactory state of order and cleanliness.

        Camp fortification was also a priority as the threat increased. An
      air raid siren was installed within the camp by the Seabees. It
      signals the alarm for air attack and is voice capable to signal the
      all clear. Concrete barriers were staged to block roadways when
      needed, and above ground bunkers were constructed.

        Additional material handling equipment (MHE) was temp-loaned to
      support the camp and SRIG units, a 7 1/2 ton crane and a 10K forklift.
      A 4K commercial forklift was also received from the Government of
      Japan (GOJ) donations. Additional GOJ vehicles, Jeep Cherokees, were
      received by this Group to reduce wear and tear on tactical assets and
      support other mission requirements such as Counter-Intelligence and
      local supply procurement.




      Enclosure (1)                 UNCLASSIFIED

                                          6

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 6 f:/Week-38/BX600020/COMMAND CHRONOLOGY 1ST SURVEILLANCE RECON INTEL GROUP DEC 19/command operation and training 31 jan 91:0102970950293
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-38
Box ID = BX600020
Unit = 1ST SRI GR
Parent Organization = I MEF
Folder Title = COMMAND CHRONOLOGY 1ST SURVEILLANCE RECON INTEL GROUP DEC 19
Folder Seq # = 17
Subject = COMMAND OPERATION AND TRAINING 31 JAN 91
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 02-JAN-1997