                                    LESSONS LEARNED


                                       [ERECTION]

           10. PROBLEM: THE PW ADMIN SPACE IS NOT SUFFICIENTLY STOCKED WITH
           ADMINISTRATIVE SUPPLIES OR EQUIPMENT TO BEGIN PW OPERATIONS AS
           PER THE FLEET HOSPITAL ACTIVATION PLAN AND S.O.P.


               SOLUTION: SINCE THE PW SPACES ARE SUPPOSED TO BE AMONG THE
           FIRST TO BE ERECTED, PW CANNOT WAIT FOR SUPPLY TO GET ORGANIZED
           AS FAR AS ISSUING SUPPLIES TO GET PW ON LINE. THE PW ADMIN SPACE
           SHOULD BE STOCKED JUST AS THE HOSPITAL ADMINISTRATION TENT IS
           STOCKED WITH AT LEAST THE FOLLOWING EQUIPMENT AND SUPPLIES:


               2 COMPUTERS
               1 ELECTRIC TYPEWRITER
               1 COPY MACHINE [NECESSARY FOR ESSENTIAL FARMING OUT AND
               TRACKING OF WORK REQUESTS]
               PENS
               PENCILS
               PAPER (LINED AND TYPING)
               DESKS
               CHAIRS


           11. PROBLEM: EVERY FUNCTIONAL AREA IN THE HOSPITAL WITH THE
           EXCEPTION OF PUBLIC WORKS, SUPPLY AND THE CHAPEL IS HOUSED IN
           AIR-CONDITIONED TEMPER TENTS. THIS SITUATION IS VERY INEQUITABLE
           ESPECIALLY FOR THE SEABEES WHO HAVE TO WORK ALL DAY OUT IN THE
           SUN AND NOT HAVE ANY AIR-CONDITIONED AREA TO TAKE A BREAK IN.
           LACK OF AN AIR-CONDITIONED SPACE ALSO INHIBITS OPERATION OF A
           COMPUTER WHICH IS ABSOLUTELY NECESSARY FOR THE EFFICIENT
           OPERATION OF PUBLIC WORKS.


               SOLUTION: PROVIDE TEMPER TENTS FOR ALL FUNCTIONAL AREAS.

           12. PROBLEM: THERE WERE NOT ENOUGH ISO CONTAINER TO TEMPER TENT
           CONNECTORS AND MUM UNIT TO TEMPER TENT CONNECTORS.


               SOLUTION: ENSURE THE CORRECT QUANTITIES OF TENTS PARTS ARE
           PACKED WITH THE HOSPITAL TOA.


           13. PROBLEM: GENERAL PURPOSE LARGE TENTS UTILIZED FOR BERTHING
ED.

               SOLUTION: PROVIDE TEMPER TENTS WITH SUFFICIENT POWER GROUP
           SUPPORT FOR THESE AREAS.






                                      UNCLASSIFIED

                                           5

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 17 f:/Week-36/BX300052/FLEET HOSPITAL WORKING PAPERS VARIOUS SOURCES CNA 2837/lessons learned debarkation:10049613380410
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-36
Box ID = BX300052
Unit = FLEET HOSP
Parent Organization = NAVCENTCOM
Folder Title = FLEET HOSPITAL WORKING PAPERS VARIOUS SOURCES CNA 2837
Folder Seq # = 11
Subject = LESSONS LEARNED DEBARKATION
Document Seq # = 57
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 04-OCT-1996