                                    LESSONS LEARNED


                                      [ELECTRICAL]

           1. PROBLEM: THE 100 KW GENERATORS WERE NOT BROKEN IN PRIOR TO
           SHIPMENT WITH HOSPITAL TOA. THE PROBLEM STEMS FROM THE FACT THAT
           THE GENERATORS ARE NOT SATISFACTORILY LOADED WHEN THE HOSPITAL IS
           FIRST ERECTED. THIS COULD CAUSE THE GENERATORS TO LOSE THE LOAD
           IF THEY EVER HAVE TO BE FULLY LOADED.


               SOLUTION: HAVE THE 100 KW GENERATORS SHIPPED AS PART OF THE
           HOSPITAL TOA ONLY AFTER BEING RUN A MINIMUM OF 200 HOURS UNDER
           85% LOAD.

           2. PROBLEM: THE CEs DO NOT HAVE THE TECHNICAL EXPERTISE REQUIRED
           TO REPAIR THE INTERNAL ELECTRICAL WORKINGS OF THE 100 KW
           GENERATORS.

               SOLUTION: AUGMENT THE CBUs WITH AT LEAST ONE CE OR CM WHO HAS
           ATTENDED FORMAL GENERATOR TRAINING.

           3. PROBLEM: THERE ARE NO 225 AMP CIRCUIT BREAKERS IN 'A' PANELS
           FOR FEEDING THE 'B' PANELS. [BREAKER IN 'A' PANEL RATED AT 100
           AMPS & 'B' PANEL IS RATED AT 225 AMPS.]


               SOLUTION: PROVIDE AT LEAST ONE 225 AMP CIRCUIT BREAKER IS
           NEEDED FOR EVERY 'A' PANEL.


           4. PROBLEM: NO 'B' PANELS HAVE PASS THROUGH RECEPTACLES;
           THEREFORE, NO 'B' PANELS CAN BE CONNECTED IN SERIES.

               SOLUTION: PROVIDE A PASS THROUGH RECEPTACLE FOR EACH 'B'
           PANEL. CXNOCK OUT IS AVAILABLE.]

           5. PROBLEM: THERE ARE NO REPLACEMENT 20 AMP SINGLE-PHASE 110V
           SNAP-IN SQUARE 'D' CIRCUIT BREAKERS FOR 'C' PANELS.

               SOLUTION: PROVIDE AT LEAST 3 DOZEN IN THE HOSPITAL TOA.

           B. PROBLEM: THERE WERE TOO MANY 50 FOOT LENGTHS OF 250 MCM CABLE
           PROVIDED YET NO OTHER LONGER LENGTHS WERE PROVIDED.

               SOLUTION: CUT BACK ON THE 50 FOOT LENGTHS AND ADD 5 ROLLS OF
           250 FOOT LENGTHS.

00 AMP CABLE [50' LENGTHS].

               SOLUTION: PROVIDE APPROXIMATELY 20 ROLLS OF 100' LENGTH 100
           AMP CABLE.




                                         UNCLASSIFIED
                                           lo

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 17 f:/Week-36/BX300052/FLEET HOSPITAL WORKING PAPERS VARIOUS SOURCES CNA 2837/lessons learned debarkation:10049613380410
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-36
Box ID = BX300052
Unit = FLEET HOSP
Parent Organization = NAVCENTCOM
Folder Title = FLEET HOSPITAL WORKING PAPERS VARIOUS SOURCES CNA 2837
Folder Seq # = 11
Subject = LESSONS LEARNED DEBARKATION
Document Seq # = 57
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 04-OCT-1996