         DASG-HCD                    POINT PAPER


         SUBJECT: Potential Surge +or Chemical Biological Protection
         Shelter


         1.       Requirement: The Surgeon General has projected that in
         order to sustain treatment of casualties in a
         c:hemically/bialogically contaminated environment in the current
         theater 400 CBPS would be required(based on current number of
         deployed forces).

                             us                FMS          TOTAL
                            400                  0            400

         2.  (U) Inventory: Current CBPS inventory is as follows:

             CONUS Stocks      Theater Reserve      PM Held Reserve Total
                  0                  0                     0            0


             (U) Surge Capabilities:

             a. (U) Current Program.

                 (1). (U) The CBPS consists of an inflatable shelter and
         HMMWV mounted NBC/environmental support system. The program is
         entering full-scale development in IQFY91. The CBPS shelter
         design is mature. Engineering development testing ( including
         chemical simlilant testing ) has shown the shelter to be a
         significant improvement over its predecessor, the M51 Shelter
         System. The  environmental support system design is still in
         progress and preliminary testing will be completed in March 1991.

             b.  (U)  Surge Data:


                 (1).  @ MAX Surge Rate: 20 per month

                 (2).  Mt Achieved by:

                 (3).        Shifts: At full capacity will operate at
         2-8-7


                 (4).      Assumptions:    Production costs are based on a
         requirement for 400 items. The unit cost is anticipated to be
         $180,000.

iting -factors- The most expeditious means to procure
         the CBPS is to award sale-source contract modifications to the
         current shelter and power system fabricators. A complete
         technical data package for the system is not yet available so a
         competitively awarded contract would not be possible.

         5. (U) Testing/Sa+ety implications: The risk for surging
         is considered low if the current development con         rs are
                                                            tQ*F@      y
                                                                  @D PY,
         awarded the contract. Live agent testing of thec
         recommended prior to system release.     fe E:f%n
                                   UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 3 f:/Week-36/BX003201/POTENTIAL SURGE FOR CHEMICAL BIOLOGICAL PROTECTION SHELTER/potential surge for chemical biological protecti:10049613285210
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-36
Box ID = BX003201
Unit = OTSG
Parent Organization = HSC
Folder Title = POTENTIAL SURGE FOR CHEMICAL BIOLOGICAL PROTECTION SHELTER
Folder Seq # = 17
Subject = POTENTIAL SURGE FOR CHEMICAL BIOLOGICAL PROTECTI
Document Seq # = 1
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 04-OCT-1996