Document Page: First | Prev | Next | All | Image | This Release | Search

File: 100896_sep96_decls24_0001.txt
Page: 0001
Total Pages: 4

Subject: POTENTIAL SURGE FOR CHEMICAL BIOLOGICAL PROTECTION SHELTER      

Unit: OTSG        

Parent Organization: HSC         

Box ID: BX003201

Folder Title: POTENTIAL SURGE FOR CHEMICAL BIOLOGICAL PROTECTION                                              

Document Number:          1

Folder SEQ  #:         24



                                                            Declassified per SECARMY by CMH:
                                          (Nr-t,%r)rT       10-02-1996
                                                        UNCLASSIFIED



           DASG-HCD                          POINT PAPER



           SUBJECT:   Potential Surge for Chemical Biological Protection
           Shelter


           1.                       : The Surgeon General has projected that in
           order to sustain treatment of casualties in a
           chemicallv/biolociically contaminated environment in the current
           theater 49 CBPS would be required(based on current number of
           deployed forces).

                                  us                   FMS             TOTAL
                                 400                     0                400

           2.   (U) Inventory: Current CBPS inventory is as follows-.

                CONUS Stocks         Theater Reserve          PM Held Reserve Total
                      0                      0                        0                0


                (U)


                a. (U) Current Program.

                     (1). (U) The CBPS consists of an inflatable shelter and
           HMMWV mounted NBC/environmental support system. The program is
           entering full-scale development in 1OFY91. The CBPS shelter
           design is mature. Engineering development testing ( including
           chemical siml(lant testing ) has shown the shelter to be a
           significant improvement over its predecessor, the M51 Shelter
           System. The      environmental support system design is still in
           progress and     preliminary testing will be completed in March 1991.

                b.   (U)    Surge Data:


                     (1).   @     MAX Surge Rate: 20 per month

                     (2).   @     Achieved by:

                     (3).   @     Shifts- At full capacity will operate at
           2-8-7


sumptions:          Production costs are based on a
           requirement for 400 items. The unit cost is anticipated to be
           $160,000.

           4. (U) Limiting +actors: The most expeditious means to procure
           the CBPS is to award sole-source contract modifications to the
           current shelter and power system fabricators. A complete
           technical data package for the system is not yet available so a
           competitively awarded contract would not be possible.

           5. (U) Testing/Safety implications- The risk for surging
           is considered low if the Current development contr@@..-,AE4r
           awarded the contract. Live agent testing of the system may
           recommended prior to system release.
                                         UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 4 f:/Week-36/BX003201/POTENTIAL SURGE FOR CHEMICAL BIOLOGICAL PROTECTION/potential surge for chemical biological protecti:10049613285411
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-36
Box ID = BX003201
Unit = OTSG
Parent Organization = HSC
Folder Title = POTENTIAL SURGE FOR CHEMICAL BIOLOGICAL PROTECTION
Folder Seq # = 24
Subject = POTENTIAL SURGE FOR CHEMICAL BIOLOGICAL PROTECTI
Document Seq # = 1
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 04-OCT-1996