Document Page: First | Prev | Next | All | Image | This Release | Search
File: 120396_sep96_decls15_0002.txt
Subject: MINUTES OF THE BIOLOGICAL DEFENSE COMMITTEE MEETING
Unit: OTSG
Parent Organization: HSC
Box ID: BX003203
Folder Title: MINUTES OF THE BIOLOGICAL DEFENSE COMMITTEE MEETING
Document Number: 1
Folder SEQ #: 173
UNCLASSIFIED
DAMO-SW
SUBJECT: Minutes of the Biological Defense Committee Meeti
19 September 1991, Memorandum 4-91
information based on Committee/work Group information.. Al
groups must have their Tank brief input to the Army, DAMO-S 7
27 Sep.
e. MAJ Klenke, Army, updated vaccine production
capabilities. Analysis indicates that under current produc
vaccinating a one or two Corps force against anthrax cannot
achieved until FY94. The total FY95 force will take until
Under an accelerated anthrax production program, the FY95 f
can be vaccinated in FY95. Analysis also shows that at no
under current production capacity, will sufficient stocks e .0
allow a one Corps force to be vaccinated against botulinum
Construction and operation of a new botulinum toxin product
facility could result in a two Corps force vaccination capal
by FY98 and vaccination of the FY95 force by FY02.
f. LTC Newing presented a methodology on how to df ne
vaccination requirements. It is based on the the 93-95 JSCI
regional contingency planning options for CENTCOM, EUCOM, ai
PACOM. Using Service force allocations for each region and
contingency should provide a reasonable data base estimate
which to develop the total vaccination requirement. Each Sf
will provide DAMO-SWC, not later than 25 Sep, a worksheet 1:
personnel requirements for each region and contingency. J-!
coordinate Service personnel requirements for deliberate plz
as quickly as possible for consistency with defense plannin(
scenarios. J-5 will also define FY95 force requirements.
g. CWO3 Bryce, USMC, reviewed efforts of the
eed to review
funding requirements. Strong justification is required to t
the need, or lack of a need, for additional funds. If prog3
cannot be developed in time to support the Tank briefing, SE s
must provide the Work Group Chairman with a timeline for
accomplishing their requirements review along with a game p]
This timeline is due by 30 Sep and applies across the board
regardless of the item of equipment or program.
h. (U) The Decontamination Working Group raised the is
joint doctrine. This will be worked by the Joint Staff, whi
each Service will work Service peculiar doctrinal issues. Z
will look at including joint biological defense doctrine and
guidance in Draft Joint Pub 3-11 and the JSCP respectively.
i. MAJ Rober@uson, USAF, reviewed the recommendatio )M
the Physical Protection Working Group. After some discussic
committee accepted the finding that there may not be any voi
respiratory protection and that percutaneous protection is n
required. However, all Services must identify to the Work G
2
laiclin" - NCLASSIFIED
%;LUIViL-V U
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 7 f:/Week-36/BX003203/MINUTES OF THE BIOLOGICAL DEFENSE COMMITTEE MEETING/minutes of the biological defense committee meet:11089615085416
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-36
Box ID = BX003203
Unit = OTSG
Parent Organization = HSC
Folder Title = MINUTES OF THE BIOLOGICAL DEFENSE COMMITTEE MEETING
Folder Seq # = 173
Subject = MINUTES OF THE BIOLOGICAL DEFENSE COMMITTEE MEET
Document Seq # = 1
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 08-NOV-1996