Document Page: First | Prev | Next | All | Image | This Release | Search
File: 120396_sep96_decls50_0001.txt
Subject: FUNDING REQUIREMENT FOR XM28 COLLECTIVE PROTECTION FOR CHEM
Unit: OTSG
Parent Organization: HSC
Box ID: BX003201
Folder Title: FUNDING REQUIREMENT FOR XM28 COLLECTIVE PROTECTION FOR CHEM-BIO HARDENING
Document Number: 1
Folder SEQ #: 22
UNCLASSIFIED
16 Nov 90
DASG-HCD
FUNDING REQUIREMENT FOR XM28 COLLECTIVE
PROTECTION FOR CHEM/BIO HARDENING OF CORPS HOSPITALS
1. (U) Purpose: To provide information to DAMO-FDR on the additional
funding requirements for the XM28 and associated systems.
2. @ Issue: There is no collective protection systems for
protection of corps hospitals in the AOR against the chemical and
biological warfare threats.
3. @ AOR Request for Support:
a. @ CENTCOM Surgeon requested expeditious fielding of
collective protection systems for use in Operation Desert Shield (Msg,
151215Z Sep 90, USCINCCENT Surgeon (CCSG), subject: Chemical Casualty
Collective Treatment).
b. @ CENTCOM Surgeon requested the Surgeons General of the
services to provide "protective devices" to medical units in the AOR
that would permit them to function in a chemical environment (Msg,
300922Z Oct 90, USCINCCENT Surgeon (CCSG), subject: Medical Care in
Chemical Environment).
4. (U) Equipment Capability - The 64 ft and 16 ft sections of XM28
are total packages of chemical liners and filter blowers. Patient
0 processors are litter entryways for rapid processing of patients. The
ISO and TEMPER vestibules are the chemical liners for the passageways
between the hardwall ISO shelters and the TEMPER tents. ISO hardening
is providing filter blowers and chemical resistant gaskets.
Environmental control unit (ECU) hardening modifications if making the
current fielded ECU's operable in a chem/bio environment. All theses
hardening efforts will provide a total integrated collective
protection system for the corps hospitals.
support the
force increase in the AOR as announced by President Bush is
significant. The additional $7.95M requested addresses only part of
the plus up requirements and reflects the CP equipment which can be
produced in FY91. Additional CP funding requirements for hospitals
may be as high as $25M based on projected force increases.
6. @ Impact of No Funding: severe compromise in the ability to
treat, manage and protect patients. If engulfed in a chem/bio attack,
hospital medical capabilities will be significantly degraded because
of contaminated medical equipment and supplies which are difficult to
decontaminate.
7. @Projected delivery of CP equipment is 3QFY91.
DECLASSIFIE@ Robert Eng/756-8163
ON: 28 OCT 96
CLASSIFIED BY: MULTIPLE SOURCE43Y: SEC ARMY (DAMH) UNDER SEC 3.4 EO 12958
DECLASSIFY ON: OADR
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 1 f:/Week-36/BX003201/FUNDING REQUIREMENT FOR XM28 COLLECTIVE PROTECTION FOR CHEM-BIO HARDENING/funding requirement for xm28 collective protecti:1122961634198
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-36
Box ID = BX003201
Unit = OTSG
Parent Organization = HSC
Folder Title = FUNDING REQUIREMENT FOR XM28 COLLECTIVE PROTECTION FOR CHEM-BIO HARDENING
Folder Seq # = 22
Subject = FUNDING REQUIREMENT FOR XM28 COLLECTIVE PROTECTI
Document Seq # = 1
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 22-NOV-1996