Document Page: First | Prev | Next | All | Image | This Release | Search

File: 080596_jun96_decls21_0172.txt
Page: 0172
Total Pages: 253

Subject: 24TH MECH INF DIV OPERATION DESERT STORM AFTER ACTION REPORT    

Box  ID: BX001437

Document Number:          2

Folder Title: 24 MECH INF DIV AFTER ACTION REPORT                                                             

Folder Seq #:        785

Unit: 24TH ID     

Parent Organzation: XVIII CORPS 






                                     UNCLASSIFIED
                                                                     05/30/91
                                   JULLS LONG REPORT

          1. (U) JULLS NUMBER: 43070-28381 (00001), submitted by 24  SIGNAL
          BN, 24 ID, 870-5516, (912)767-5516.

          2. (U) Other OPN DESERT STORM NOTES conducted by 24 IN DIV  (MECH)
          on 03/05/91.

          3. (U) KEYWORDS: HEAT, EFFECTS OF HEAT, SIGNAL EQUIPMENT,
          MAINTENANCE, .

          4. (U) TITLE: IMPACT OF HEAT ON SIGNAL EQUIPMENT

          5. (U) OBSERVATION: The extreme heat of the Saudi Arabian and
          Iraqi deserts had a detrimental effect on the functioning of
          some signal equipment.

          6. (U) DISCUSSION:   The AN/TTC-41 (automatic switchboard
          experienced significant maintenance problems because of
          overheating. In addition, the AN/GRC-106 experienced
          overheating problems.

          .7. (U) RECOMMENDED ACTION: All switchboard air conditioners
          should be exchanged for units which are designed to work in low
          humidity (arid),regions. Also, the air conditioner should be
          mounted on the front of the shelter so it will dispense cool air
          directly on the SB-3614. The AN/GRC-142 (RATT) should be
          equipped with air conditioners to preclude overheating of the
          organic AN/GRC-106 radio.



              (U) SUBJECT: COMMUNICATIONS

              (U) INTEROPERABILITY: MATERIEL

              (U) Lesson distributed by: 24TH IN DIV.



















                                       Page - 1

                                     UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 253 f:/Week-22/BX001437/24 MECH INF DIV AFTER ACTION REPORT/24th mech inf div operation desert storm after a:08029615062350
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-22
Box ID = BX001437
Unit = 24TH ID
Parent Organization = XVIII CORPS
Folder Title = 24 MECH INF DIV AFTER ACTION REPORT
Folder Seq # = 785
Subject = 24TH MECH INF DIV OPERATION DESERT STORM AFTER A
Document Seq # = 50
Document Date =
Scan Date = 12-JUN-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 02-AUG-1996