Document Page: First | Prev | Next | All | Image | This Release | Search

File: 120396_jun96_decls9_0010.txt
Page: 0010
Total Pages: 41

Subject: DAILY SITREP 7TH ENGINEER BDE                                   

Unit: VII CORPS   

Parent Organization: ARCENT      

Box ID: BX000213

Folder Title: SITUATION REPORTS  7TH ENG BDE  22 DEC 90- 10 APR 91                                            

Document Number:          5

Folder SEQ  #:          1







            Dpily@SITREP--'7th Engr Bde                  Page



                     (3) Lack of 1YV(3's and nosition locator devices remain
            one of "Uhe most. critical problems in the brigade.    Wit@liou'L these
            assets we will be unable to provide effective engineer support at
            night.

                     (4)  'R@@uest immediate issue of one fest test @.,D serve as
            a n., a r@ depot. @Without a facility of this type we will not be able
            to break down and issue maps in forward areas to meet Corps
            --qeads .


                     (5) Request that revised Corps construction priorities
            be published ASAP.

                     (6)  Request issue of at least 6 Is-paleli DS
            Dozers; equipment is critical to 'he widening of iriiti
                                                                      -a! lanes
            into gaps.

                     (7) Request that all units with airfield matting be
            directed to relocate matting Ali@.h their organic assets when they
            deploy f i, future oL@er-atic)n-L,,

                     ('O) Need held from VII Copps in tracking hospitalized
            2o!di@y-s@ The LI@10 system is not working. Also the RRDs ape not
            yet transporting cup soldiers from the port. As our liiits move
            forward even unit transportation of returning soldie2,s@bec@oiytea
            increasingly difficult.

                     (9) Request clarification ol 'Dep'@o@7ment Orders' from
            unit     Both GI-I and ci-@@ staffs have no knowledge of these
            orders. Many financial and other institutions require           Tinlit
            deployment ord8r2"in order to corfcclete transactions.

            2. POC S-3, 7th Engineer Brigade, 9-7598-718.

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 41 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily sitrep 7th engineer bde:11089615143325
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY SITREP 7TH ENGINEER BDE
Document Seq # = 5
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 08-NOV-1996