              Daily SITREP 7th Engineer Brigade

              261450C JAN 91
              TO: Vil Corps G-3 (6p8)

                   a. Situation. Brigade units continue       construction of Log
              Base Echo. Construction of EPW compound continues. Units continue
              to train with combat units.


                   h. Operations/Tng. Construction:

                       (1)   Log Base Echo:

                             (a) Access R6ad--90%


                             (b) TPT--40%


                             (c!) CL V 65%


                       (2) EPW,Compound: 75%


                   e.  Combat Support Equipment Readiness         89%


                       personnel


                           Per8 in            % in            Pers
                         Theater            @Tbeater        in TAA8              DECLASSIFIE
                            5,880              70            4,743               D
                   g.  Unit Locat Iions:                                         ON: 03 OCT
                                                                                 96
                       HHC 7 ENG BDE        PS 439144                            BY: SEC
                       HHC 176th ENG   GP   NS 560560                            ARMY
                       HHC 926th ENG   GP   NS 559612
                                                                                 (DAMH)
                   h.  Problems Requiring Corps Assistance:                      UNDERSEC
                                                                                 3.4 EO 12958
                       (1)   The issue  of night vision and navigation     devices
              needs to be   resolved for the engineer units that support the
              maneuver  unilts. Engineer combat capabilities are diminished
              without these devices.


rward@ A
              fest tent or similar sized tent is necessary for the quantity of
              maps required by Corps@

                       (3) Topographic survey teams will conduct survey control
              north of Log Base Echo from 27-29 Jan.These surveys are done at
              night. Request local security for the teams

                       (4) Late arriving engineer units will require priority
              transportation assets to move equipment forward to the FAAs and
              beyond to support the engineer effort.

                                                        ED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 41 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily sitrep 7th engineer bde:11089615143325
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY SITREP 7TH ENGINEER BDE
Document Seq # = 5
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 08-NOV-1996