Subject: DAILY SITREP 7TH ENGINEER BDE
Unit: VII CORPS
Parent Organization: ARCENT
Box ID: BX000213
Folder Title: SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Document Number: 5
Folder SEQ #: 1
FIED
PRO t, COA'm,4,jz>@, 7
1 @ -s 3
T(2 @C)ICio 5 3 0 P5 151500 Jan 91
1. Daily Corps SITREP.
a. Situation. Brigade currently finishing up project for
lst CAV DIV.
b. Operations/Tpg. Mission completion delayed due to Ist
CAV DIV project.
a. Combat Support Equipment Readiness 88 %
f. Personnel
peps in % in Pers
Theater Theatep in TAA's
5186 62 4857 DECLASSIFIED
ON: 03 OCT 96
g. Unit Locations: BY: SEC ARMY
HHC 7th EN BDE PS 439144 (DAMH) UNDER SEC
HHC 176th EN GP PS 425125 3.4 EO 12958
HHC 926th EN GP US 599730
h. Problem Requiring Corps Assistance
(1) Brigade currently has a 31 day backlog of effort
for the entire FMC fleet of bulldozers. This volume of work does
not include work estimates for Log Base E, Tapline road and
pipeline crossing sites, Corps barrier training area, or
survivability missions for higher headquarters CPs. Recent
effort on FRAGO 34-91 (Defense of Wadi Al Batin Approach)
expended hundreds of hours of dozer and scraper effort. The
result is two battalions falling below 90% OR for D7 dozers. I
have directed work reduction in those units. If we ape to
maintain an operational engineer effort for future operations, we
must cease the multitude of isolated 'digging in" projects and
only focus on the top priority missions stated above.
(2) Understand significance of dust pallative. Have
received an additional 300 barrels. Will continue max effort in
this area. We have Deceived only 10% of total material
requirement for current airfields in Corps.
(3) Ede is maximizing use of organic haul assets. When
not moving heavy engineer equipment, we continue to transport
arriving CSE companies from port and hauling maps to the Corps
TAAS.
(4) The crossing site locations for 1 AD near LOG BASE E
are still not available. Completion time will be delayed as a
result.
(5) '@ecent task organization changes for training
purposes increases the requirement fop issue of night vision and
LORAN devices to brigade units. We need them now.
2. POC S-3 7th Engineer Bri de 9-7598-718,
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 41 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily sitrep 7th engineer bde:11089615143325
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY SITREP 7TH ENGINEER BDE
Document Seq # = 5
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 08-NOV-1996