Document Page: First | Prev | Next | All | Image | This Release | Search
File: 970107_sep96_decls23_0025.txt
Subject: ENCLOSURE A TO APPX 2 TO TAB H TO VII CORPS DS AAR
Unit: VII CORPS
Parent Organization: ARCENT
Box ID: BX000262
Folder Title: NBC OPERATIONS-SUMMARY-APPENDIX 2
Document Number: 3
Folder Seq #: 2
UNCLASSIFIED
ori%nr,r
e. MAJ Frazier, G-4, reported there are 28,509 CPOGs in LBE.
Any units wanting their ASL had to request it.
26 FEB 91:
a. MAJ Cortes, Rear Chem, reported 5 push packages assembled:
2 Bn, 2 Co, and 1 Chem Co.
b. SSG Boyer, ARCENT, developed a plan for collecting,
transporting, and disposing of any located chemical equipment.
They would publish it after the war so as not to confuse the
situation.
C. TAC still worked on linking 2d Chem with 1AD. They also
said the injured Fox crew was only slightly injured and would be
back to duty within 24 hours.
27 FEB 91:
a. An Iraqi Chemical NCO held as an EPW was interviewed. fie
stated a blue whistling flare is the warning to Iraqi troops of
chemical fires. He also stated artillery rounds with chemical
fills are marked IAW following:
Nerve Agent --- 3 Red Stripes
Choking Agent --- 3 Green Stripes
Blister Agent --- 3 Yellow Stripes
b. 51st Chem Co was on hold to move to Log Base Nellingen
because priority of movement was to maneuver units. Two platoons
were on standby to move within two hours notice. The entire
company was on order to be at Log Base Nellingen which was forward
of the LD and breach within 6 hours after notification.
c. COL Thornton directed TAC be contacted to recommend to COL
Cherrie, Corps G-3, that the Corps MOPP level be reduced to zero
south of Phase Line Smash and West of the 60 N-S Grid Line. This
would help MSR preparation, 2ACR recovery, and Log Base Nellingen
erations. Corps TAC Chem, CPT Shuplinkov briefed the G-3. lie
decided to stay with MOPP-1 because there was too much
confusion/turmoil on the battlefield now to reduce it; but, he
would reconsider IAW the heat/temperature index. Several units
called throughout the day wanting reconfirmation of the level. 7th
Engineer Brigade representative said COSCOM and MP units across the
LD weren't maintaining MOPP-1 as part of his argument for lowering
the MOPP level to zero.
Cri%nr-r
.U@
UNCL7sgi IFED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 30 f:/Week-42/BX000262/NBC OPERATIONS-SUMMARY-APPENDIX 2/enclosure a to appx 2 to tab h to vii corps ds a:01029718424467
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-42
Box ID = BX000262
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = NBC OPERATIONS-SUMMARY-APPENDIX 2
Folder Seq # = 2
Subject = ENCLOSURE A TO APPX 2 TO TAB H TO VII CORPS DS A
Document Seq # = 3
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 02-JAN-1997