Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Parent Organization = CENTCOM
Unit = ARCENT
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Document Number = 5
Box ID = BX000525
NOTE: (1) latrine slmps remin on both sites. EPWs can use interim
slit trenches if necessary.
(2) Lighting systems cmplete on both c&xlpr--
(3) Per G2 and DIA present overall capacity is adequate.
S.
2) Phases II and III are complete. Per G4 POL stated that
fuel is flowing since 24 Feb.
3) Phase IV: British coupling leaks have been repaired and
receiving fuel at destination.
3) Phase V is 1931
Document Page:
First |
Prev |
Next |
All |
Image |
This Release |
Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997