rigid pipeline was successfully tested 24 FEB. Have installed 10 of 12
pump stations. EPW CCHPOUNDS: Eastern Site: Camp #1: 90% The fence
enclosures for the carry are complete. Bermirig and sanitary lagoon are
complete. Currently have 25 towers, 127 latrines and 120 showers. Cainp
#lA 87% 30 enclosures complete. 27 scaffolding sets are needed at this
site. The beniis and sanitary lagoon are cmplete. Western Site: #2 85%
Engineer effort on site is ocuplete. There are 22 tadexs, 320 latrines,
and 135 shadexs on site. Digging sumps and improving roads continues.
The sanitary lagoon is omplete. #2A 80% 100% of cairp is bermed. The
sanitary lagoon is cmplete.
B) ENGINEER ISSUES: N/A
C) PRIORITY OF WOW: Priority is to pipelines, then
D) PRICRITY OF SUPPORT: N/A
E) MPOGRAPHIC SUPPORT: The 624TH MAP Distribution DEr is
f urr-tional, based on personnel augmentation provided from ARCENT. CcmTarxi
and Control relationship is being defined.
F) PROPOSED OPERAT'IONS: A new road status reporting system is
being finalized. libe requested data will begin on 28 FEB.
C. CORPS
1. VII CORPS/77H ENIM BDE: Report riot received
2. XVIII ABN COPPS/20TH ENM BDE: Engineer Update 241944Z FEB 91
A) CURRENT OPERATICNS: 6TH LT AR DIV crossed the ID at 0400
hairs. 27 EN BN crossed the ID following 6TH LT AR DIV at 0600 hours. 20
EN BDE TAC CP and 937 EN GRP TAC CP moving up MSR Texas. 20 EN BN and 37
EN BN Providing mobility Support to MSR Texas. 265 EN GRP Working MSR
Georgi.a and preparing to move and drup teams along MM Georgia to support
mobility. Crude Oil shipuent departed DHABRAN today and should arrive vic
MSR Georgia 25 FEB. 101st crossed the ID at 0700 hairs, engineers
providing mobility Support for Divisional MSR New Market. 241D arxi 3ACR
Crossed the ID at 1500 hairs, mobility Support to Divisional MRS eniTX@,-x
priority. Ensure tractcr trailer assets are returned upon cmpletion of
assigned missions. Beware of booby traps; blanket found in hunker in 6TH
LT AR DIV AO was wired. EPW taken in MARCERR AO was wired, bomb found
when EPW was searched. G+3 Target Ncmimtions: ii-AMY Batteries, 30-ARTY
Bns, 3-Arwr Bns, L-EIV HQs, 2-BDE HQs, 1-Anrior Co, 3-CPs, I-Armor BDE,
1-+Iech BDE, 1-Mech T/F, 2-Inf BDFS, and I-Mrtar Bn.
B) ENGINEER ISSUES:
I. Class IV Shortages - unit coordination for mci dust
palliative mlst be thraigh Corps D-igr Section. MCI pidclp and retirn of
tar*ers mist be done as expeditiously as possible. Contract needs 24 hour
rxytice prior to delivery.
G-DAY PG 6
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997