Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Parent Organization = CENTCOM
Unit = ARCENT
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Document Number = 5
Box ID = BX000525
J) ME;R Status:
West Range Road - Arber, 43 EN EN's is now BCD 1 Mar
East Range Road - Red, has been deferred.
SE Dodge - Green, shoulder work; ECD 24 Feb; will verify.
NW Dodge - Gram, cold patch work casing minimal traffic
disruption.
Sultan(Nash) - Green
NW Old Tapline - Green
SE Old Tapline - Green
XVIII AEN Corr)s blc-4Zs to IOGBASES FCMD and OSCAR
Georgia - Green - 6 lanes good to border
Montana - Gmm - 6 lanes good to border
Texas - Green - 2 lanes good to border
Ohio - Green -- 2 lanes good along border
vii corK)S M mms
Green - Green - 2 lanes up to the "Zeroline(boundary
of Nr and NS map grids) about 25KM south of the border.
Black - Green - 2 lanes up to Zeroline
K) Water:
1) Five Well cmpletion kits are in country with 296th WD
currently with 20th EN BOE. Five well cmpletion kits from the ship value
are located at the railyard with SUPCC14.
2) VII Corps informed through IOG SITREP on particulars of
pick-up. VII Corps wants to move I of 3 allocated kits; anticipates their
coscom can move it.
L) Displaced Citizen Caups: G4/Engineer Task Force on
facility and logistics support for DCs in Iraq and Kuwait continues
efforts. C34PIM gjbli&lied and distributed. USAM shelter material for
DCs and EPWs beim flown from Omp Darby, Italy. Requested late arrival
date of 26 Feb and verifying flight details.
B. EAC/416TH ENCC14: Engineer Status Report #56 25093OZ FEB 91 and
Ccnmk-u,jderl's SITREP # 70 25093OZ FEB 91
A) CUIUWQT OPERATIONS: Range Road is Red. 43D EN BN continues
to repair a sub-base failure; ECD is 15 MAR to initial standards. SE MSR
Dodge is Green. rrraff ic diversion continues, one way from MER Dodge to
Old Tapline Road betmben 0800 to 1700 hours daily to permit required
shoulder repair. 176 of 224KK have been repaired. ljhe estimated
CCInPletion date of this section is 24 M. 'Ihe unit will continue final
iwrovenentr. until 1 MR. No detour will be reqiired. All other roads
still green. SWAPDOP - Pipeline project: Phase V 68% 78]KK of rigid
pipe and 481
Document Page:
First |
Prev |
Next |
All |
Image |
This Release |
Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997