Document Page: First | Prev | Next | All | Image | This Release | Search
File: 970501_aug96_sagwi2_0015.txt
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Parent Organization = CENTCOM
Unit = ARCENT
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Document Number = 5
Box ID = BX000525
5) Saudi-,controlled Class IV at KKt4C: CPT Mar-szalek and BG
Schardein to travel to IUM to meet with LTC Assaf; departure TBD.
6) Harzard Marking Tape: Finalizing contract for red/white
diagonal plastic tape on 25 Feb with a delivery of 26 or 27 Feb.
I) Contract Status:
1) AR-014 Heliport Apron at FM - advertising
2) AR-042 Heliport Apron at KFIA - 16% ccaplete
3) AR-043 Heliport at An-Nulariyah - 10% c@owlete
4) AR-080 Heliport Apron IPS#3 - 1% complete
5) AR-081 Heliport Apron at Lisafah - 10% complete
6) AR-062 Heliport Apron for 2ACR - 1% complete
7) AR-110 Heliport Apron vic PS6515 - 2% complete
8) AR-111 Heliport at MM - 2% ccuplete
9) AR-125 OTand Aircraft parking Apron at Al Qaysmah
39% complete
10) AR-107 DTand Aircraft Parking at ME (C5A) - 63%
cmplete
NOTE: G4 signed and sent ARCERR AVN cancellation request.
J) MSEZ Status:
West Range Road - Amber, 43 EN EN's is now ECD 1 Mar
East Range Road - Red, has been deferred.
SE Dodge Green, shoulder work revised ECD is 24 Feb due to
rain delay/damage.
NW Dodge Green, cold patch work casing minimal traffic
disruption.
Sultan(Nash) Green
NW Old Tapline - Green
SE Old Taplim - Green
XVIII ABN Corps MSRs to IDGEASES FICHM and OSCAR
Georgia - Green - 6 lanes good to border
Montana - Green - 6 lanes good to border
TexEks - Green - 2 lanes good to border
Ohio - Green - 2 lanes good along border
vii oorps m msizs
Green - Green - 2 lanes up to the "Zerolir)e(buindary
Of Nr and NS map grids) about 25KK south of the border.
Black - Green - 2 lanes up to Zeroline
K) Water:
1) Five well cmpletion kits are in country with 296th WD
currently with 20th EN BDE. Five well completion kits from the ship Value
are located at the railyard with SUPCCM.
2) VII corps'informed through IOG SITREP on particulars of
pick-up. VII Corps wants to move 1 of 3 allocated kits; anticipates their
ODSOCM can move it.
G+l PG 6
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997