Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Parent Organization = CENTCOM
Unit = ARCENT
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Document Number = 5
Box ID = BX000525
4) ENTM %EEPPING DATA: No CHANGE.
H. PBC= ACKIOWUMM: 416TH CDRIS SITREP #7o/&4M SRATUS RPr
#56. POC MJ BUSH 7804-233.
III. SPECIFIC OPERATIONAL ACrl=ES
A. AR= ENGINEER
1. FOI&DW/MDBILE CP: ACE, XVIII ABN Corps, called asking if
Flippers, GEMKS, and 90M were in LOGBASE CHARLIE and can we confirm. ACE
also provided locations of units and daily task organization update. ACE
VII Corps reported they were not going to build MSR Packard, three graders
lost tires on MSR due to unexploded ordnance, and reported road status
with 3AD crossing previously unknown msrs. ARcENr r.3 stated FRAGO #61
will include attaching an engineer battalion to ist CAV.
2. OPERATICNS: See DA 1594
3. FACILrITES/ODNSn;@'=ON:
A) Theater EPW Caups: Both BRONX and BROOKLYN are 98% complete
and can handle 48,000 EPWs P-adi. BRONX has force main work remaining; EcD
is 2 Mar. BROOKLYN has some collection, laundry, and sha*x@x, sump work
remaining and EM is 7 bear. EMs cm use interim slit trenches if
necessary. Per G2 and DIA, present overall capacity is adequate.
B) Corps EPW Canips: Per MA,7 Sarigianj-s, XVIII ABN Corps has
all materials. VII Corps is apparently iqmovising for materials; MP
BDE constructing carp has riot requested materials through ARCERR.
C) Pipeline:
1) Phase I: Flowing; has too much water. Will use with Fuel
System Icing Inhibitor.
2) Phases II and III are complete.
3) Phase IV: British pipe leaking and cannot hold pressure
required; continuing to pump while laying 15 miles of rigid pipe next to
lay flat hose. ECD is 5 Mar.
3) Phase V is 193KK to LOGBASE AIPHA. 145KM layed, 144KK
coupled, 88KK aligned, tested and packed. interim ccmpletion date is 1
Mar. The ships Robert E. Lee, 96Kis and President Polk have arrived; 85
miles of pipe awaiting on dock for transportation. Pipeline unit does not
have haul capability at present. Will set up temporary fill station at
PS#7, 96I
Document Page:
First |
Prev |
Next |
All |
Image |
This Release |
Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997