                            L) Displaced Citizen Canips: G4/Engineer Task Force on
              facility and logistics support for Dcs in Iraq and Kuwait completed.
              OONPLM published arrl distributed. USAID shelter material for DCs and
              EYWS being flown from Carp Darby, Italy on C-130S. ,They are scheduled to
              arrive at UW-EW on 26 Feb at 163OZ, 180OZ, and 2245Z. Provided 22nd
              SUPCCM, ACSLOG, the allocation request.

                  B. EAC/416TH ENCOt4: Engineer Status Report #58 27093OZ FEB 91

                      A) CUFdM?r OPERATIONS: Range Road is Red. 43D EN BN continues
              to repair a sub-base failure; BCD is 15 MAR to initial standards.     SE MSR
              Dodge is Azber. Traffic diversion oontimes, one way from MSR Dodge to
              Old Tapline Road between 0800 to 1700 hours daily to permit required
              shoulder repair. 208 of 224KM have been repaired. Ihe unit will continue
              f irial improvements until I MAR, wet weather has continued to impede
              progress. No detour will be required. All other roads still green.
              SWAPDOP - Pipeline project: Phase V 71% 145KK of rigid pipe has been
              installed. Three hundred Hauls are the estimated requirement for
              this phase. Two-hunderd seventy-four hauls completed to date.      Fuel to
              Alpha by 1 NAR. Final rigid pipe construction complete by 10 MAR. 641

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997