Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Parent Organization = CENTCOM
Unit = ARCENT
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Document Number = 5
Box ID = BX000525
A) CUFDZEW OPERATIONS: VII Corps Engineer continue to support
offensive operations. Effort is concentrated in mobility for maneuver
units and maintenance and construction of critical MSPs and routes.
Residual effort will be used to provide survivability for critical
cmmunications and Air Defense Units. Task organization has been changed
to meet evolving situation.
B) ENGBIEER ISSUES:
1. Engineer Mnitions. MICTIC. Need MCOCM to approve and
institutionalize the f ixes. other units should riot have to continue
experimentation.
2. Equiptnent Issues. 7 EN BDE still needs additional 916
tractcr assets to haul heavy equipment. German equi-pnmt issue only
replaces 5 of 23 short. RPV Airfield. Lesson learned from this operation
is that the RPV is a resource eater. It needs its own runway material or
a different =:)de of launch/recovery. Airfield ratting, that mist be moved
every 2-3 days is just not the answer. Explosive sniffing dogs (ARCENT
IDGSMT Report #171) understand that minefield or individual mine locating
is riot primary mission for explosive sniffing dogs. However, we have no
reliable way of locating nxxlexn plastic mines. The explosive sniffing dog
option is one that may be worth pursuing for future use. Replacement
platoons arriving without equipment (Mil3s, 5 Tons, crew"served weapons).
Difficult to integrate and still maintain unit integrity. Need to get
M113s for these units. Need theater reserve for low density engineer
equipment, (dozers, scrapers, etc) suggest factor from doctrinal
publications (FMs) and buy or lease commercial replacements for combat
losses. Dust Palliative storage. appreciate ARCERr's offer of a 210K
gallon bladder located at LOGBASE BRAVO for storage of palliative. If
ARCENT can move this Gonzo Bladder to LOGBASE ECHO, we would be glad to
use it. Dust Palliative Transport. VII Corps supports ARCENT effort to
procure trucks for use in transporting and spreading palliatives. Leased
trucks with GI drivers will help alleviate the backlog.
C) PRIOPXIY OF WORK: Not reported
D) PRIORITY OF EFFORT: Not reported
E) TOPOGRAPHIC SUPPORT: Not reported
F) PROPOSED OPERATIONS: Engineers assigned to 2ACR, 1AD and
3AD are supporting unit mobility and providing division supply routes.
3AD has the additional task of oonstructuq Corps MSR Burgandy. 176 EN
GRP is improving the lanes through the breach and establishing LOGBASE
NELIM4GEN forward of the breach, to include the road net. 109 EN MT has
responsibility for the Corps rear to include maintenance of MSRs and
construction of additional; MSR lanes. MSR Green complete to IDGEASE
NMM4GEN. MSR Blue to intersection of Blue and Purple. MSR DuVarxiy to
PT7878.
2. XVIII A13N OORPS/20M EN'GR BDE: Report not received
G+2 PG 7
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997