                  C. MAIN SUPPLY ROM MAINTENANCE AND REPAIR: NO CHANGE.


                  D. PIPELJNE CONSTRUCTION: ROBERT E. LEE HAS AIUU-VM WrM 85 MILES OF
              IPDS PIPE, VgXrING TRANSPOIMCION. PHASE V: 145/193 KM IAID; 144 KM
              COUPLED; 88 KM ALIGNED AND TESTED. REMAIRM PIPE MUST COME ETM PORT.
              TM)OPMY FILL STATION AT 96 KM MARK LMn PEMMEP CCtff4MM. POC LTC
              MURPHY 7804-449.


                  E. NFN M= SOURCES: NO CHANGE.


                       OTIM.


                       1) EPW COMPOUNDS: NO aiAME.

                       2) SHELTER MATERIAL FOR DISPLACED CIVILIANS: AS OF 271000C FEB
              SUPCCM REPRESENTATIVES OONFIRMED 810 ROLLS BAD ArdU"@M AT EEVU-IRM.
              EMRTS CORRINLJE TO 10= REMADUM 190 ROLLS. POC CPT BLBCKMAN
              7804-449.


                       3) WELL COMPLENON KrrS (FOR VII OORPS): MJ BALCAZAR, VII CORPS
              ENGR, RBWEMM ARCERR MOVE WELL CCBIK=ON KETS FMU@PD. TWO WELL
              CCMP=CN KEM WERE RELEASED TO HQ, 71H EUM BDE, ON 25 FEB (D=MENR
              NUMBER WK4FCOI05606OZ). BOIH KrM APE STILL IOCATED AT THE 321ST MMC
              MITIM PICK-UP BY 7TH E@ BDE. POC CPT REIaEM/CPr MRSZALEK 7804-448.

                  G.   NAIURATIVE.


                       1) ENGR CLASS V: No aiAME.

                       2) ENM cEIPPING DATA: NO CHANGE.

                  H.   PBC= ACRRMLEDGED: VII CORPS ENGREP #45. POC MAj BUSH
              7804-233.


              Ill. SPECIFIC OPERATIONAL ACRIVITIES


                  A. ARCERR ENGINEER

                       I. FOIWM/MOBILE CP: Issue of attaching Fire Fighting
              Detachments to Kuwaiti Task Force surfaced, contacted both Corps to
              determm lq:)aat- XVIII ABN Corps identified the one FLS, Vic PLJ4456, it
              will construct and reported unit locations. ACE, vii corps, reported
              Engineer Group missions; MSR status and locations; MSR Blue is flooded and
              is Corps construction priority; 1ID having problems with unexploded
              M-d@; and 82 EN EN took 3 KEAs and 3 WLks when M113 was hit by sabot
              round. Passed potential FRAGO to VII Corps reference clearing IPSA
              Pipeline Road; passed to ACE, XVIII ABN corps, Air Foroe scAimiNE Report.

                       2. OPERATIONS: See DA 1594


                       3. FACILa:TIES/CONSIRUCrICN:







                                                G+3 PG 2

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997