Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525







                              2. B4uipment Issues. 7 EN BDE still needs additional 916
              tractor assets to haul heavy equipment. German equipment issue only
              replaces 5 of 23 short. RPV Airfield. Le-%son learned from this operation
              is that the RPV is a resource eater. It needs its own rurrway material or
              a dif ferertt niode of launch/recovery. Airfield ipattuig, that must be moved
              every 2-3 days is just riot the answer. Explosive sniffing dogs (AR=
              WG= Report #171) understand that minefield or individual mine locating
              is not primary mission for explosive sniff ing dogs. However, we have no
              reliable way of locating modern plastic mines. The explosive sniffing dog
              option is one that may be worth pursuing for future use. Replacement
              platoons arriving without equipment (NI13s, 5 Tbns, crew-served weapons).
              Diff icalt to integrate and still maintain unit integrity. Need to get
              M113s for these units.    Need theater reserve for low density engineer
              equipment, (dozers, scrapers, etc) suggest factor from doctrinal
              publications (FMs) and buy or lease commercial replacements for cmbat
              losses.   Dust Palliative Transport. VII Corps supports ARCE\IT effort to
              procure trucks  for use in transporting and spreading palliatives. Leased
              trucks with GI drivers will help alleviate the backlog.

                           C) PRIORITY OF WORK: Not reported

                           D) PRIORITY OF EFTDFC: Not reported

                           E) TOPOGRAPHIC SUPPOIU: Not reported

                           F) PROPOSED OPERATIONS: Engineers assigned to 2ACR, 1AD and
              3AD are supporting unit mobility and providing division supply routes.
              3AD has completed construction Corps MSR Burgundy to Objective Collins.
              176 EN GRP is establishing LOGBASE NELLINGM to include the road net and
              MSR Blue. 109 EN (MP has responsibility for the Corps rear to include
              maintenance of MSRs and construction of additional; MSR Lanes. MSR Green
              0owlete to IOGBASE NE1124GEN. MSR Blue to PU5210. Tomorrow it will go to
              PT'8500.  MSR Burgundy to PEJ0510.

                      2. XVIII ABN CORPS/20TH MGR BDE: Engineer Update 271927Z FEB 91

                           A) CUI@PM OPERATIONS: 24M secured Objective Gold, and
              attacked and secured Objective Orange, engineers continue to support the
              D3'.vision's destruction of the L@GFC and mark cmlbat trails. jolst secured
              Objective Tim, engineers upgrading cmibat trails to objective Tim and will
              be prepared to upgrade airfield in the vicinity if required. 82D moved to
              secure Objective Gray. 3ACR in support of 24ID, engineers continue to
              construct ccubat trails. 20 EN BN constructing ILGRASE ROMM. 37 EN BN
              working on MSR Virginia, then moving to vic FSA Saturn and to construct
              MSR (Rreen. 62 EN EN constructing MSR Colorado and then will construct MsR
              Utah. 52 EN BN will complete construction of NSR Yankee and then move to
              MSR Packard, 844 EN BN works on MSR Georgia to IOGBASE RaNM)o and rear area
              support. FT.S will not be constructed at LOGBASE act-=, FTS will be placed
              Vic JALIBAH or Objective Tim. VII Corps approved our use of MSR Packard.
              Corps EPW Cage will be moved from Vic LOGBASE M4ED to Objective Orange.
              Crude Oil deliveries continue through 3 NAR. MSG sent out to Kscs on map
              tmm-in point. B52s today dropped CBU YAmitions on the AL FAW Division
              VIC XVIII ABN Corps, be advised this mmunition has a high dud rate.
              Working retrograde movement with MOC for Corps Engineer Units; current
              plan is to move back to TAAS. Workuxg redeployment TPPDL.


                                                G+3 PG 7

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997