Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Parent Organization = CENTCOM
Unit = ARCENT
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Document Number = 5
Box ID = BX000525
construction complete by 10 MR. BORM of rigid pipeline was successfully
tested 26 FEB. Have installed 11 of 12 pump stations. Per Quartermaster,
lay-flat pipe will riot be used. Quartermaster will construct a temporary
fuel dispersing Station at PLUV Station #7 (96KM along the traoe) . Fuel
will be transported to LOMME Alpha. EPW OMPOUNDS: Eastern Site: Camp
#1: 90% The fence enclosures for the cap are complete. Berming and
sanitary lagoon are emplete. Currently have 25 tadexs, 127 latrines and
120 showers. Additional requirements for EPW processing are underway.
Camp #lA 87% 30 enclosures complete. 27 Scaffolding sets are needed at
this site. The berm and sanitary lagoon are cmplete. Additional
requirements for EPW processing are underway. western Site: #2 85%
Engineer effort on site is complete. There are 22 towers, 320 latrines,
and 135 showers on site. Digging slmips and '
improving roads continues.
The sanitary lagoon is omplete. Additional rew=ereents for EPW
processing are underway. #ZA 80% 100% of camp is bermed. The sanitary
lagoon is complete. Additional requirements for Epw processing are
underway-
B) ENGINEER ISSUES: N/A
C) PRIORITY OF MR(: Priority is to pipelines, then mc3Rs.
D) PRIORITY OF SUPPORT: N/A
E) TOPOGRAIIIUC SUPPORT: N/A
F) PROPOSED OPERATIONS: A new road status reporting system is
being finalized. A qualitative MSR Report will be submitted daily to the
ARCEM Engineer via 416th Engineer Status Report (per SOP). A
quantitative MSR Report will be submitted weekly by separate
correspondence.
C. OORPS
1. VII CORPS/7'IH ENM BDE: Engineer Report #46 272400C FM 91
A) CLTDUM OPERAMONS: VII Corps Engineer continue to support:
Offensive operations. Effort is concentrated in mobility for maneuver
units and mirrtp@ and construction of critical MgRs and routes.
Residual effort will be used to provide survivability for critical
communications and Air Defense Units. Task organization has been changed
to meet evolving situation.
B) ENGINEER ISSUES:
1. Engineer mnitions. miclic. Need Amcocm to approve and
institutionalize the fixes. other units should not have to contnue
experimentation.
G+3 PG 6
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997