Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525








                       3) OONSIRUCIIJON PRWB= VALIDMC)N: CENICM RE7JIRES A
              REVALIDATION OF AI.L UNSLAF= DD POW 1391 CONSIRUCIR.EON PROJECTS BY 4
              MAR. ARCERR ENGR IS CWMCRING AIL PPD= PROPONENTS FX)R BIEW. A
              PRW= RMEN BOARD IS TRUATIMY SaM= FOR 3 MAR. POC LTC MURPHY
              7804-449.


                  G. NA14ZATIVE-


                       1) ENGR CIASS V: NO CHANGE.

                       2) ENM SHIPPING DATA: NO CHANGE.

                  H. RECEIPT ACKNUWLEDGED: 416TH ERM SLAAUS #58, 20TH MGR BDE R@M
              LTDATE 271927Z FEB. POC MJ BUSH 7804-233.


              III. SPECIFIC OPERARITONAL ACTI=ES


                  A. ARCERR ENGINEER

                       1. FOFMM/MDBILE CP: ACE VII Corps provided information on MSRs
              and unit locations. Informed SUPCCt4 that proposed CIS III Point is
              outside of ARCEar Sector and boundary change is rAKxW from the G3.
              Received FAX of CERIMM FRAGO on survey of part facilities, forwarded
              R@AM to G3 and drafted engineer input.

                       2. OPERATIONS: See DA 1594

                       3. FACI=ES/CDNSTRUCTIION:

                          A) Theater EPW Canps: Both BRONX and BROOKLYN are 98% complete
              and can handle 48,000 EPWS each. BRONX has force Main Work remaining; EM
              is 2 Mar. BROOKLYN has sane collection, laundry, and shadex, sump work
              remaining and EM is 7 liar. Remaining work on both sites has no effect on
              overall capacity.

                          B) Corps EPW CAUIPS: Operating

                          C) Pipeline:

                            1) Phase I: Flowing; has too Much Water. Filtering and
              Fuel System Icing Irit@itor will be used..
                            2) Phases II and III are complete.
                            3) Phase IV: no demand from LOGBASES; will shut down to lay
              15 miles of rigid pipe; BM is 5 Mar.
                            3) Phase V is 193KR to LOGBASE AIPM. 172KM layed, 172I

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997