D) Patriot Power: DWUPM battery is hooked up to connercial
Pmer. U"MM AB Battery Contractor left the country. 535th EN DEr and
SUPOOM engineer working; no ECD. Transformer being imtalled at MA
site; ECD is I Mar. Riyadh AB, on fourth site; project complete. FiXed
generators. Contractors will deliver two generator/trailers on 2 Mar;
reminder on 5 Mar. All 12 mobile generators and trailers are now in
country.
E) ARCENT HQ Power: Transformer installed. 416th ENOa4
promwing materials for emergency power plan and requesting cancellation
of emergency back-up pro3ect. SCEOD began work at School House on 18 F@eb;
ECD is 4 Mar.
F) EMW Army Airfield Power: The work request with guidance
has been forwarded to 2nd ASB,
G) 86th Signal BN Power: Plan for commercial power connection
has been forwarded to ARCERR G3.
H) CLass IV (Barrier):
1) Cr--x3ertina: 13,500 rolls available at L093ASE BRAVC);
2,200 rolls available at 321st MC at DANM.
2) Pickets: 129,000 each, various sizes, available at
LOGBASE BRAVO; 28,000 each, various sizes, are at 321st MMC.
3) Sandbags: 1,283,000(+) at 321st MM and 3,900,000(+) at
IOGBASE BRAW.
4) Saudi-controlled Class IV at KM: BG Sdiardein to meet
with LTC Assaf.
I) Class IV (Construction):
1) Gravel: Gravel is available for pick-up from quarry vic
NS4062. 155th EN 00 (CS) is on site as augmentation.
2) Dust Palliative: 843 barrels (44,679 gallons) available
at LOGBASE BRAVO. Contract for delivery of 9000 barrels (477,000 gallons)
awarded. 1874 of 2000 barrels delivered as of 27 Feb to Ash-Shubah. 4126
barrels to be split between LOGBASES BRAVO and ECHO. Remaining 3000
barrels and bulk issue option on hold, but available if needed.
3) Crude oil: Al-QaysLunah pmp broken; ARAMCO repairing.
No ECD. Second access point to line will take two weeks to construct; do
not anticipate urgent need then. Delivery #3 (48K gal to VII Corps) -
lost?, Delivery #4 (120K gal to XVIII ABN Corps) - contract drivers
delivered 80K to VII Corps the rest lost?; Delivery #5 (48K gal to VII
Corps) - diverted arxi arrived at XVIII AEN Corps on 26 F@eb; Delivery #6
(48K gal to XVIII) - 16K arrived 27 Feb, 16K arrived 28 Feb, remainder
emoute; and Delivery #7 (120K gal to XVIII) - departed 27 Feb. Totals:
544K sent, 136K delivered to XVIII @,M Corps, 136K delivered to VII Corps,
152K erwoute, 120K unknown. Both corps indicate continuing need for crude
oil.
4) Airfield matting: VII Corps picked up two sets of
XK-19, but cannot find 19 truck loads. LTC Camlido and (-V4 Hof firan, 800th
M4C, are trying to locate. XVIII ABN Corps mattuig has been delivered to
Vic LOGBASE CHARLIE. AN2 Will be Stored at Warehouse 15 at port.
G+4 PG 3
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997