Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525







                                5) Harzard Marking T@i@: contractor delivered red/white
               diagonal plastic tape on 26 Feb to 416th ENCC14.
                                6) Barbed Wire: RCCM procuring 20,000 spools through Host
               Nation; delivery to start I Mar to IDGRASE BRAVO. 14,000 of 45,000 each
               1.7m rebar pickets delivered to IMC on 27 Feb.

                             j) contract Status: Reviewing all unstarted construction
               projects for need and suitability; will provide input to CENTCM by 4
               Mar. Initiated staff action to start Construction Project Review (CPR)
               Board at HQ, ARCERR.

                              K) MSR Status:

                    West Range Road - Amber, 43 EN EN's is now ECD 1 Mar
                    East Range Road - Red, has been deferred.
                    SE Dodge          - Green, shoulder work revised EM is 24 Feb due to
               rain delay/damge.
                    NW Dodge          - Green, cold patch work casing minimal traffic
               disruption.
                    Sultan(Nash)      - Green
                    NW Old Tapline    - Green
                    SE Old Tapline    -- Green

                    XVIII ABN Corr)s KIMS to IOGBASES FOW and OSCAR

                    Georgia                 - Amber      6 lanes; due to rain
                    Montana                 - Green      6 lanes good to border
                    Te@@                    - Green      2 lanes; due to rain
                    Chio                    - Gmm        2 lanes good along border
                    Virginia                - Green      2 lanes gravel
                    Colorado                - Green      2 lanes gravel
                    VII Corr)s KEY MRs
                    Green and   Blue        - Amber      both have 10-15 inud holes on each
               MSR; plan is to have 109th EN V-ditch drainage.
                    Black                   - Green - 2 lanes gravel

                             L) Displaced Citizen Cwnps: G4/Engineer Task Force on
               facility and logistics support for DCs in Iraq and Kuwait ompleted.
               ODNPIM published and distributed. USAID shelter material for DCs and
               EPWs being flown from Carp Darby, Italy on C-130s. Two flights arrived
               DHABRAN 26 Feb with 810 rolls. One flight with 190 rolls due 28 Feb
               Provided 22rid SUPOOM, Acsim, the allocation request. It appears from
               present situation that no camps are required; will confirm with G5.

                             M) Life Support Area:

                    Nam                            %Ccmlete            BrD       Water Well
                    I

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997