4) Phase V is 193IC4 to IOGBASE ALPM. 1721 is I Mar. Riyadh AB, on fourth site; project cmplete. Fixed
generators. Contractors will deliver two generator/trailers on 2 Mar;
remainder on 5 Mar. All 12 mobile generators and trailers are now in
country-
E) ARCM HQ Power: Transformer installed. 416th EUOCM
procuring materials for emergency puwex plan and requesting cancellation
of emergency back-up project. SCECO began work at School House on IS Feb;
BM is 4 Mar.
F) ESMN Army Airfield Pa4ex: Ihe work reguest with guidance
has been forwarded to 2nd ASB,
G) 86th Signal BN Pudex: Plan for commercial power connection
has been forwarded to ARCERR G3.
H) Class IV (Barrier):
1) Concertina: 13,500 rolls available at LOGBASE BRAVO;
2,200 rolls available at 321st MW at DAMMAN.
2) Pickets: 129,000 each, various sizes, available at
LOGBASE BRAVO; 28,000 each, various sizes, are at 321st MMC.
3) Sandbags: 1,283,000(+) at 321st MMC and 3,900,000(+) at
IOGBASE BRAVO.
4) Saudi-,oontrolled Class IV at IWE. BG Scliardein to meet
with LTC Assaf.
I) Class IV (Construction):
1) Gravel: (;ravel is available for pick-up from quarry vic
NS4062. 155th EN OD (CS) is on site as augmentation.
2) Dust Palliative: 843 barrels (44,679 gallons) available
at IOGBASE BRAVO. Ccntract for delivery of 9000 barrels (477,000 gallons)
awarded. 1874 of 2000 barrels delivered as of 27 Feb to Ash-Stlubah. 4126
barrels to be split between LOGBASES BRAVO and BCHO. Remaining 3000
barrels and bulk issue option on hold, but available if needed.
3) Crude oil: Al-QaysLwoh punp broken; ARAMCD repairing.
No BCD. second access point to line will take two weeks to construct; do
not anticipate urgent need then. Delivery #3 (48K gal to VII Corps) -
lost'?, Delivery #4 (120K gal to XVIII ABN Corps) - contract drivers
delivered 80K to VII Corps the rest lost?; Delivery #5 (48K gal to VII
Corps) - diverted and arrived at XVIII ABN Corps on 26 Feb; Delivery #6
(48K gal to XVIII) - 16K arrived 27 Feb, 16K arrived 28 Feb, reminder
enroute; and Delivery #7 (120K gal to XVIII) - departed 27 Feb. Totals:
544K sent, 136K delivered to XVIII ABN Corps, 136K delivered to VII Corps,
152K enroute, 120K unknown. Both Corps indicate continuing need for crude
oil.
G+5 PG 3
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997