Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525







                     2) %MTER MTERM FOR DISPLACED CIVILIANS: S= CAN NOT
             LOCATE THE NISSING 190 BOLLS. POC CPr BLBCRW 7804-449.

                     3) CONSTRUCTION PROJECT VALIDATION: No CHANGE.

                 G.  MRRATIVE. (FOR FORSOCM) FLOW OF THE 365TH EN BN (CH) MST BE
             STOPPED DKMIATELY. AN MENSIVE REVIEW OF REWDOENTS IN VDFAM DOES
             NOT JUSTIFY THE ADDITIONAL FORCE glFd3CIURE. ARCERR G3 TRANCZMTIM SAME
             MMSAGE TO FORSCCM J3. POC COL MMLER (ARCENT G3) OR NAJ BUSH (ARCERR
             ENM) 7804-233.

                     1) ENGR CLASS V: No CHANGE.

                     2) ENGEZ SHEPPING DATA: NO CHANGE.

                     3) REDEPLO)tbOU PRIORITIES (REF MSG, CWJSARCEEIT NUN //AFRD-IOT//
             SLJW: NAJOR SUBORDINATE COMMM (MSC) REDEPLO)ME PRIORMES): MSG
             RBC@LWM DUMIAL ORDER OF REDEPLOMM AND SPECIFIC DATA FOR EACH UIC.
             TO ASSIST EACH RiM MSC ARCENT ENM WI:IL PROVIDE UNDER SEPARATE COVER THE
             DEKJOYMU PAX AND MM@ DEPMMM BULK OGO IN SIONSIMIONS FOR EACH EUM
             UIC. ENM NSC'S CAN USE THIS IMIMNON TO VERIFY THEIR OWN REDEP!EDYMEtqT
             DATAL. POC MAJ BUSH 7804-233.

                 H. RECEIPT AjCMiOWLE=: 416TH CDRIS SITREP #73/ENM STATUS RPT #59,
             VII CORPS ENGREP #47. POC NAJ BUSH 7804-233.

             III. SPECIFIC OPERATICNAL ACTIVITIES


                 A.  ARCENR ENGINEER

                     1. FOF&DW/MOBILE CP: No entry

                     2. OPERATIO14S: See DA 1594


                     3. FACI=ES/ODNSTRUCrION:

                         A) Theater EPW Camps: Both BRONX and BROOKLYN are 98% complete
             and can handle 48,000 EPWs each. BRONX has force main work remaining; ECD
             is 2 Mar. BROOKLYN has sane collection, laurdry, arid shower, sump work
             remaining and BCD is 7 Plar. Remaining work m both sites has no effect on
             overall capacity.

                         B) Corps EPW Camps: Oioexating

                         C) Pipeline:

                            1) Phase I: Flowing; has too mich water. Filtering and
             Fuel System Icing Inhibitor will be used.
                            2) Phases II and III are complete.
                            3) Phase IV: no demand frown IOMMES; will shut down to Jay
             15 miles of rigid pipe; BCD is 5 mar.






                                               G+5 PG 2

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997