Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Parent Organization = CENTCOM
Unit = ARCENT
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Document Number = 5
Box ID = BX000525
M) Life Support Area:
Name -%Ccmlete Water Well
17IA 38% 910415 0%
Rieonix City 90% 910318 55%
Bastogm 96% 910318 90%
I;udowici 99% 910318 75%
Abqaiq 94% 910318 95%
Pulaski 97% 910318 70%
NOTE: Contract awarded for POWPU supply.
B. EAC/416'IH ENOON: Engineer Status Report #61 02093OZ MAR 91 and
Cmmk-eider's SITREP #75 02093OZ MR 91
A) CLO@M OPERATICNS: Range Road is Amber. 43D EN BN continues
to repair a sub-base failure; BCD is 15 MAR to initial standards. SE MSR
Dodge is Green. The shoulder repair is complete. 224 of 224RM have been
repaired. The shoulder will require continuous maintenance. All other
roads still green. SWAPDOP - Pipeline project: Phase V 80% 177KM of
rigid pipe has been installed. Quartermaster has ceased hauling pipe to
complete this segment, the line has been successfully tested to Pump
Station #7. EPW COMPOLNDS: Eastern Site: Camp #IA 90% continuing
installation of force main and check valves. Facility will be reported
complete once all engineer tasks are ccaplete including lighting and
sanitary facilities. Western Site: #2 85% Engineer effort on site is
complete. 'Ihere are 22 tmj'ers, 320 latrines, and 135 showers on site.
Digging sumps and improving roads continues. The sanitary lagoon is
complete. Additional requirements for EPW processing are underway. #2A
80% 100% of camp is bermed. The sanitary lagoon is ccaplete. Additional
retiirmmts for IEPW processing are undexway.
B) ENGINEER ISSLJES: Class IV Update: lW4C - Aggregate continues
to be hauled to MSR Green with no interruption on flow; a total of 32,000
cubic meters of aggregate is to be delivered to Patriot Sites. Additional
aggregate has been requested. 144 cubic meters of concrete is scheduled
to be delivered,2 MAR 91, for the Air Force constructed K-Span.
C) PRIOR= OF WOIU<: Priority is to pipelines, then MsRs.
D) PRIORM OF SUPPORT: N/A
E) TOPOGRAPHIC SLJPPOIC: N/A
F) PROPOSM OPERATIONS: A new road status reporting system is
being finalized. A qualitative MSR Report will be submitted daily to the
ARcE"r Engineer via 416th Engineer Status Report (per SOP). A
quantitative MM Report will be submitted weekly by separate
correspondence.
C. ODRPS
l. VII CORPS/7TH ENGR BDE: Engineer Report #48 012400C MAR 91
G+5 PG 5
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997